Text
.
p Sasso
,8 UNITED STATES
,, u J '
NUCLEAR REGULATORY COMMISSION 7:
j WASHINGTON. D. C. 20555 d
,g.... +,o VIRGINIA ELECTRIC AND POWER COMPANY
\\
Ot.D DOMINION ELECTRIC COOPERATIVE DOCKET NO. 50-339 NORTH ANNA POWER STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 51 1
License No. NPF-7 1.
The_Nucitar Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Virginia Electric and Power Company, i
et al., (the licensee) dated February 11, 1985, complies with j.
the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application.
.the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety cf the public; and E.
The issuance of this amendment is'in accordance with 10 CFR Part
-51 of the Comission's regulations and all applicable requirements have been satisfied.
i E
i P
P
?
^
. - ~. -. _ - _.,, _ -,, _ _,..., _.
. 2.
Accordingly, the license is amended by changes to the Technical Speci-fications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-7 is hereby amended to read as follows (2) Technical Specifications TheTechnicalSpecificationscontgnedinAppendicesAandB, as revised through Amendment No.
are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Edward J. Butcher, Acting Chief Operating Reactors Branch #3 Division of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance:
August 21, 1985 e
---m f
f
'mi-,
m,
_ --= ' '. M e* 4 '-
J.
e *
- rls h'"
e see m -w p4 m,w.,
,a
<.-.w.
- '**nemh*mC----~~P
ATTACHMENT TO LICENSE AMENDMENT NO. 51 TO FACILITY OPERATING LICENSE NO. NPF-7 DOCKET NO. 50-339 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page as indicated. The revised page is identified by I
amendment number and contains vertical lines indicating the areas of change.
The corresponding overleaf page is also provided to maintain document i
completeness.
3/4 4-21 em e
e o
O e
e e
4 9
I e
L,..
m *~ m wn. - - J i, r.- __
m,,
s,i n s, p mm.s r~.w.ww :...,
w.~<m.~~-
T w~- * - -
sq
TABLE 4.4-3 REACTOR COOLANT SYSTEM CHEMISTRY LIMITS SURVEILLANCE REQUIREMENTS HINIMUM N
PARAMETER ANALYSIS FREQUENCIES DISSOLVED OXYGEN
- At least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> CHLORIDE **
At least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> l
FLUORIDE **
At least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> l
^ Not required with T,yg less than or equal to 250*F Not required when the Reactor Coolant System is drained below the reactor pressure vessel nozzle and the internals and/or head are in place.
4
.i..<-
NORTH ANNA - UNIT 2 3/4 4-21 Amendment No. 51
i 1
REACTOR COOLANT SYSTEM 3/4.4.8 SPECIFIC ACTIVITY LINITING CONDITION FOR OPERATION 3.4.8 The specific activity of the primary coolant shall be limited to:
Less than or equal to 1.0 pCi/ gram DOSE EQUIVALENT I-131, and a.
b.
Less than or equal to 100/E pCi/ gram.
APPLICABILITY:
MODES 1, 2, 3, 4 and 5.
ACTION:
MODES 1, 2 and 3*
With the specific activity of the primary coolant greater than a.
1.0 pCi/ gram DOSE EQUIVALENT I-131 but within the-allowable limit (below and to the left of the line) shown on Figure 3.4-1, operation may continue for up to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> provided that the, cumulative operat-ing time under these circumstances does not exceed 800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> in any consecutive 12-month period. With the total cumulative operating time at a primary coolant specific activity greater than 1.0 pCi/ gram DOSE EQUIVALENT I-131 exceeding 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> in any consecutive 6-month period, prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within 30 days indicating the number of hours above this limit.
The provisions of Specification 3.0.4 are not applicable.
b.
With the specific activity of the primary coolant greater than 1.0 p.Ci/ gram DOSE EQUIVALENT I-131 for more than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> during one continuous time interval or exceeding the limit line shown on Figure 3.4-1, be in at least HOT STANDBY with T less than 500'F avg within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
With the specific activity of the primary coolant greater than c.
less than 500"F 100/E pCi/ gram, be in at'least HOT STANDBY with T,yg within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
"With T,yg greater than or equal to 500'F.