August 22, 1985 Docket No. 50-417 DISTRIBUTION
. Docket File NRC'PDR local PDR Mr. Jackson B. Richard PRC System Senior Vice President, Nuclear NSIC Mississippi Power & Light Company LB #4 r/f P.O. Box 23054 MDuncan Jackson, MS 39205 t.Kintner OELD, Attorney
Dear Mr. Richard:
ACRS (16)
BGrimes JPartlow EJordan
Subject:
Grand Gulf Nuclear Station, Unit 2 - Extension of Construction Permit Date By letter dated August 15, 1984, Mississippi Power and light Company requested an extension to the latest construction completion date to April 30, 1991, pursuant to 10 CFR 50.55(b).
The NRC staff is reviewing this submittal and finds that additional information is needed to complete its review, as described in the enclosure.
If there are any questions regarding the enclosed request for additional information, please contact the project manager, L. L. Kintner.
The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
Sincerely, Elinor G. Adensam, Chief licensing Branch No. 4 Division of Licensing
Enclosure:
As stated cc:
See next page DEsicyo, 9 og,c,u,u, Cortiflod By
(-
g8300239850822 A
ADocK 05000417 PDR I
C DL:lB #4 LA 0 fl0 #4 L:lB #4 n
LKintner/ah HDatk h EAdensam 841/85 8/f.2/85 8/t 2/85
REQUEST FOR ADDITIONAL INFORMATION GRAND GUI.F NUCLEAR STATION, UNIT 2 1.
Considering the projected long construction period for Unit 2, the staff recommends that the following actions be taken by Mississippi Power and light Company (MP&L) for environmental protection during construction completion.
(a) Approximately one year before loading fuel into Unit 2 MP&L should report to NRC onthe current status of all environmental permits and approvals and should provide NRC with a description of any post OL-FES design changes having potential environmental impacts.
(b) Site runoff control structures, catchment basins, and sedimentation ponds should be maintained until the site is graded to final elevations and reseeded or otherwise stabilized.
(c) The environmental protection program should continue until OL issuance.
Provide a commitment to follow the above or similar recommendations for protection of the environment until site construction is completed.
2.
Provideanupdateoftheestimatedlatestconstructioncompletionpate considering the current status of Unit 1 and ability to finance construction of Unit 2.
3.
Provide additional justification to show that good cause exists for the requested extension of construction completion date, including reasons for major delays and the basis for the estimated completion date.
r Mr. Jackson B. Richard Mississippi Power & Light Company Grand Gulf Nuclear Staiton cc*
Robert B. McGehee, Esquire The Honorable William J. Guste, Jr.
Wise, Carter, Child, Steen and Caraway Attorney General P.O. Box 651 Department of Justice Jackson, Mississippi 39205 State of Louisiana Baton Rouge, Louisiana 70804 Nicholas S. Reynolds, Esquire Bishop, liberman, Cook, Purcell Mr. Oliver D. Kingsley, Jr.
and Reynolds lice President, Nuclear Operations 1200 17th Street, N.W.
Mississippi Power & Light Company Washington, D. C.
20036 P.O. Box 23054 Jackson, Mississippi 39205 Mr. Ralph T. Lally Manaaer of Ouality Assurance Office of the Governor Middle South Services, Inc.
State of Mississippi P.O. Box 61000 Jackson, Mississippi 39201 New Orleans, Louisiana 70161 Attorney General Mr. Larry F. Dale, Director Gartin Building Nuclear licensing and Safety Jackson, Mississippi 39205 Mississippi Power & Light Company P.O. Box 23054 Mr. Jack McMillan, Director Jackson, Missistippi 39205 Solid Waste Mississippi State Board of Health Mr. R. W. Jackson, Project Engineer 880 lakeland Bechtel Power Corporation Jackson, Mississippi 39206 15740 Shady Grove Road Gaithersburg, Maryland 20760 Alton B. Cobb, M.D.
State Health Officer Mr. Ross C. Butcher State Board of Health Senior Resident Inspector P.O. Box 1700 U.S. Nuclear Regulatory Commission Jackson, Mississippi 39205 Route 2, Box 399 Port Gibson, Mississippi 39150 President Claiborre County Board of Supervisors Regional Administrator, Region II Port Gibson, Mississippi 39150 U.S. Nuclear Regulatory Commission, 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Mr. J. E. Cross, General Manager Grand Gulf Nuclear Station Mississippi Power & tight Company P.O. Box 756 Port Gibson, Mississippi 39150