Forwards Safety Evaluation Re Results of in-plant Tests of HPCS Svc Water Pump to Confirm Acceptability of Mechanical & Flow Inducted Vibrations.Vibration Levels Small & within Acceptable Limits
ML20134K457
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/23/1985
From: Novak T
Office of Nuclear Reactor Regulation
To: Richard J
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20134K461 List:
References
TAC-56972, NUDOCS 8508300224
Download: ML20134K457 (2)


Text

._

1 August 23, 1985 Docket No. 50-416 DISTRIBUTION:

~ Docket File-h

'NRC POR e Local PDR PRC System NSIC Mr. Jackson B. Richard I.B #4 r/f Senior Vice President, Nuclear MDuncan Mississippi Power & Light Company L.Kintner P.O. Box 23054 OELD, Attorney Jackson, MS 39205 ACRS (16)

JPartlow

Dear Mr. Richard:

BGrimes EJordan

Subject:

Grand Gulf Nuclear Station, Unit 1 - Qualification Tests of Service Water Pumps By letters dated February 28 and March 20, 1985, Mississippi Power and t.ight Company provided the results of inplant tests of the high pressure core spray (HPCS) service water pump for Grand Gulf Unit 1 in response to license Condition 2.C.(10)(b). The tests were run to confirm the acceptability of mechanical and flow induced vibrations under normal operating conditions.

The NRC staff has completed its review of the HPCS pump test results. The safety evaluation is enclosed. The staff concludes that the vibration levels of the HPCS service water pump during normal operation are small and within acceptable limits and the there is no evidence of flow induced excitation of resonant frequencies of vibration to any significant level. Accordingly, licenseCondition2.C.(10)(b)ha.sbeensatisfied.

51ncerely, Thomas M. Novak, Assistant Director for licensing Division of 1.icensing

Enclosure:

As stated cc: See next page DESIC.tTED cargrygt; Cortified Py,_

wwumpa P

k M0GWh{n t.A:DL: B #4 DL:t.B #4

'l DL:t.8 #4

[

t.Kintner/ah

  • EAdensam T v l

8/2t/85 8/J 4/85 8/ ot/85 8/

85

Mr. Jackson B. Richard Mississippi Power & Light Company Grand Gulf Nuclear Staiton cc:

Robert B. McGehee, Esquire The Honorable W'lliam J. Guste, Jr.

Wise, Carter, Child Steen and Caraway Attorney General P.O. 6,x 651 Department of Justice Jackson,'ffssissipoi 39205 State of Louisiana Baton Rouge, Louisiana 70804 Nicholas S. Reynolds, Esquire Bishop, liberman, Cook, Purcell Mr. Oliver D. Kingsley, Jr.

and Reynolds Vice President, Nuclear Operations 1200 17th Street, N.W.

Mississippi Power & Light Company Washington, D. C.

20036 P.O. Box 23054 Jackson, Mississippi 39205 Mr. Ralph T. Lally Manager of Quality Assurance Office of the Governor Middle South Services, Inc.

State of Mississippi P.O. Box 61000 Jackson, Mississippi 39201 New Orleans, Louisiana 70161 Attorney General Mr. Larry F. Dale, Director Gartin Building Nuclear licensing and Safety Jackson, Mississippi 39205 Mississippi Power & Light Company P.O. Box 23054 Mr. Jack McMillan, Director Jackson, Mississippi 39205 Solid Waste Mississippi State Board of Health Mr. R. W. Jackson, Project Engineer 880 f.akeland Bechtel Power Corporation Jackson, Mississippi 39206 15740 Shady Grove Road Gaithersburg, Maryland 20760 Alton B. Ccbb, M.D.

State Health Officer Mr. Ross C. Butcher State Board of Health Senior Resident Inspector P.O. Box 1730 U.S. Nuclear Regulatory Commission Jackson, Mississippi 39205 Route 2, Box 399 Port Gibson, Mississippi 39150 President Claiborne Ccunty Board of Supervisors Regional Administrator, Region II Port Gibson, Mississippi 39150 U.S. Nuclear Regulatory Commission, 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Mr. J. E. Cross, General Manager Grand Gulf Nuclear Station -

Mississippi Power & Light Company P.O. Box 756 Port Gibson, Mississippi 39150 l