UNITED STATES
l
\\
NUCLEAR REGULATORY COMMISSION
l
p
n
o
{,
_
REGloN iv
l
.f
611 RYAN PLAZA drive, SUITE 400
/
,
j
February 7.1997
,
l
!
Charles M. Dugger, Vice President
l
Operations - Waterford 3
i
Entergy Operations, Inc.
l
P.O. Box 8
,
l
Kilicaa, Louisiana 70066
l
SUBJECT: NRC INSPECTION REPORT 50-382/96-14 AND NOTICE OF VIOLATION
j
Dear Mr. Dugger:
An NRC inspection was conducted December 1,1996 through January 11,1997, at your
Waterford Steam Electric Station, Unit 3 reactor facility. The enclosed report presents the
scope and results of that inspection.
,
l
During the 6-week period covered by this inspection period, your conduct of activities at
l
.
Waterford was generally characterized by good performance of operations, maintenance,
'
engineering, and plant support. However, two violations of NRC requirements were
identified.
i
l
The first violation involves an inadequate procedure for the calibration of the hydrogen
analyzers. We are concerned that the identified discrepancies indicated a lack of rigor
i
during the development of the procedure in tnat a number of the vendor recommended
tests were not being performed. The second violation is of concern because procedures
.
were not followed regarding reporting of security lighting deficiencies. In addition,
although not a violation, inspectors had to intervene in a safety-related welding activity to
prevent a procedural violation. We are concerned that these incidents indicate a continuing
1
problem with procedural compliance among your station personnel.
.
.
.
-
An unresolved item was identified that involves apparently inadequate corrective actions
for water hammer events that occurred in tha low pressure safety injection system on
November 19 and 21,1996. We will conduct additional reviews of this issue in the near
future.
The violations are cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding the violations are described in detail in the enclosed aport. Please note that
you are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part,
to determine whether further enforcement action is necessary to ensure compliance with
!
regulatory requirements.
i
i
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
i
'
!
its enclosure (s), and your response will be placed in the NRC Public Document Room
l
(PDR). To the extent possible, your response should not include any personal privacy,
9702130166 970207
ADOCK 05000382
G
_ _ _
_ _ ..
. . _
_ . .
.
. . _
____
. _
_
-_.
_ - - - -
I
.
,
.-
.'
,
,
!
!
Entergy Operations, Inc.
-2-
!
r
!
i
l
proprietary, or safeguards information so that it can be placed in the PDR without
redaction.
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
Sincerely,
kh
y
1
J. E. Dyer, Director
'
Division of Reactor Projects
Docket No.: 50-382
License No.: NPF-38
.
Enclosures:
2. NRC Inspection Report
50-382/96-14
cc w/ enclosures:
Executive Vice President and
Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Missiesippi 39286-1995
Vice President, Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Wise, Carter, Child & Caraway
P.O. Box 651
Jackson, Mississippi 39205
General Mancger, Plant Operations
Waterford 3 SES
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
..
.
,-
.'
Entergy Operations, Inc.
-3-
.
Manager - Licensing Manager
Water ord 3 SES
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
Chairman
Louisiana Public Service Commission
One American Place, Suite 1630
Baton Rouge, Louisiana 70825-1697
Director Nuclear Safety
Waterford 3 SES
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70060
.
William H. Spell, Administrator
Louisiana Radiation Protection Division
P.O. Box 82135
Baton Rouge, Louisiana 70884-2135
Parish President
St. Charles Parish
P.O. Box 302
HahnVille, Louisiana 70057
Mr. William A. Cross
Bethesda Licensing Office
3 Metro Center
Suite 610
Bethesda, Maryland 20814
Winston & Strawn
1400 L Street, N.W.
Washington, D.C. 20005-3502
02/07/97
16:03
R IU US mC FTS
001
,
- -
,
e
.
'
!
!
Entergy Operations, Inc.
-4-
(
,
E-Mail report to T. Boyce (THB)
E Mail report to NRR Event Tracking System (IPAS)
E Mail report to Richard Correia (RPC)
'
E-Mail report t'o Ronald Frahm, Jr. (RKF)
bec to DMS (IE01) .
,.,
bec distrib. by RIV:
L. J. Callan
Resident inspector
DRP Director
DRS-PSB
~ ' Branch Chief (DRP/D)
-
MIS System
,
"
'
-
+
Project Engineer (DRP/D)
RIV File
Branch Chief (DRP/TSSI
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
i
.
i
1
,
DOCUMENT NAME: R:\\WAT\\WT614RP.LAK
To recetwo copy of dogument, indesMe in box: "C" = Copy wthout enclosures
- E" = Copy 9Mth onetsures 'w' = No copy
HIV: Shin j, M ,
C:URPjQ
D:DRP
_,l
l
l
'
a
LAKper@[ M
PHH(rr g g "JEDyer gQ$
01pl74ffi '41
02/% AP'
02/'\\ /97 *
(
OFFICIAL RECORD COPY
'gv /
.
130010