Forwards Safety Insp Repts 50-456/85-36 & 50-457/85-35 on 850722-25 & Notice of Violation
ML20134J274
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 08/26/1985
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20134J277 List:
References
NUDOCS 8508290230
Download: ML20134J274 (2)


See also: IR 05000456/1985036

Text

.

.

.

AUG 261985

Decket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. Z. Falevits

and R. Mendez of this office on July 22-25, 1985, of activities at Braidwood

Nuclear Power Station, Units 1 and 2, authorized by NRC Construction Permits

No. CPPR-132 and No. CPPR-133 and to the discussion of our findings with

Mr. T. Quaka and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities were in violation of NRC

requirements, as described in the enclosed Appendix. The inspection showed

that action had been taken to correct the identified noncompliance and to

prevent recurrence.

Consequently, no reply to this noncompliance is required

and we have no further questions regarding this matter at this time.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC's Public Document

Room.

8508290230 850826

'

PDR

ADOCK 05000456

O

PDR

'-70 25 (7 /

0lt

4

,

AUG 261985

Commonwealth Edison Company

2

We will gladly di: cuss any questions you have concerning this inspection.

Sincerely,

~~~

cfigin:1 Signed by J. J. !!arrison

J. J. Harrison, Chief

Engineering Branch

Enclosures:

1.

Appendix, Notice

of Violation

2.

Inspection Reports

No. 50-456/85036;

No. 50-457/85035

cc w/ enclosures:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

J. F. Gudac, Plant Manager

C. W. Schroeder, Licensing and

Compliance Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Braidwood

Resident Inspector, 'RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr. , Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Stevens, NRR

RIII

RIII

RII:

Ri

RI

th

f4

g

Mendez/rr Falevits

W

L ittl e

H rison

08/22/85

13/g

p

g tb

-

- - - -

-

- -

- -

-

- -

-

-