ML20134H782
| ML20134H782 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 08/23/1985 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Opeka J NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20134H785 | List: |
| References | |
| NUDOCS 8508290168 | |
| Download: ML20134H782 (2) | |
See also: IR 05000245/1985013
Text
_
DESIGRATED ORIGINAL
,,
Cortified ByIAM
t
.
.
AUG 2 31985
Docket No.
50-245
Northeast Nuclear Energy Company
ATTN: Mr. J. F. Opeka
Senior Vice President - Nuclear
Engineering and Operations Group
P. O. Box 270
Hartford, Connecticut 06141-0270
Gentlemen:
Subject:
Inspection No. 50-245/85-13 and 50-336/85-16
This refers to the routine safeguards inspection conducted by Mr. W. Madden of
this office on April 8-11, 1985 at Millstone Nuclear Power Station, Units 1
and 2, Waterford, Connecticut of activities authorized by NRC License No.
DPR-21 and DPR-65 and to the discussions of our findings held by Mr. Madden
with Mr. Mroczka, Vice President-Nuclear and other members of your staff at the
conclusion of the inspection.
This also refers to a telephone conversation
between Mr. Madden and Ms. P. Weekly, Site Security Supervisor, on May 10,
1985.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
l
Our inspector also verified the action you had taken to correct the violation
l
brought to your attention in a letter dated April 14, 1982. We have no
further questions regarding your action at this time.
Within the scope of this inspection, no violations were observed.
Sections of the enclosed inspection report contain details of your security
l
program that have been determined to be exempt from public disclosure in accor-
!
dance with 10 CFR 73.21 (Safeguards Information). Therefore, the sections so
,
identified in the inspection report will not be placed in the NRC Public
!
Document Room and will receive limited distribution.
The inspection report
!
cover sheet and the remaining portions of the inspection report will be placed
l
in the Public Document room, in accordance with 10 CFR 2.790(a).
0508290168 850823
PDH
ADOCK 05000245
G
OFFICIAL RECORD COPY
IR MILLSTONE 85-13/16 - 0001.0.0
07/30/85
q h. h,
N t
-.
.
..
-
.
_.
__
.. .
-
- -
_ - . - -
-_
_ _ .
t
.
.
Northeast Nuclear Energy Company
2
AUG 2 31985
No reply to this letter is required.
Your cooperation with us in this matter
is appreciated.
Sincerely,
Origina1 Signed By:
James H. Joynor
Thomas T. Martin, Director
Division of Radiation Safety
and Safeguards
.
Enclosure:
Combined NRC Inspection Report Number 50-245/85-13 and
50-336/85-16 (Paragraphs 3, 4,10 and 20 contains Safeguards
Information)
l
cc w/ encl: (w/o Safeguards Information, Paragraphs 3, 4, 10 and 20)
E. J. Mroczka, Vice President, Nuclear Operations
W. D. Romberg, Station Superintendent
D. O. Nordquist, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
Gerald Garfield, Esquire
Public Document Room (PDR)
Local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector (w/ Safeguards Informatien)
State of Connecticut
bec w/ enc 1: (w/o Safeguards Information, Paragraphs 3, 4,10 and 20)
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o enc 1)
Section Chief, DRP
.
,
RI:DRSS
R
MI:1
3S
RI
S
Madden /geb
ig
90 n9r
T.
rtin
7/]I/85
P ze cf
f Uff3'
,-y -
0FFIC AL RECORD COPY
R MILLSTONE 85-13/16 - 0002.0.0
'
07/30/85