ML20134H650

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-369/85-10 & 50-370/85-11 on 850207-0703 & Notices of Violation & Deviation
ML20134H650
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 08/15/1985
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20134H653 List:
References
TAC-59698, TAC-59699, NUDOCS 8508290078
Download: ML20134H650 (2)


See also: IR 05000207/2007003

Text

e

o$c;cl

,

o

,

s

.

AUG 151985

Duke Power Company

/ ATTN:

Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT:

REPORT NOS. 50-369/85-10 AND 50-370/85-11

On February 7 - July 3,1985, NRC inspected activities authorized by NRC License

Nos. NPF-9 and NPF-17 for your McGuire facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report. The NRC's concerns relative to the

inspection findings were discussed by Dr. J. Nelson Grace of this office and

Mr. H. B. Tucker of your office, in an Enforcement Conference held at the

l

Region II Office in Atlanta, Georgia on July 3, 1985.

1

Areas examined during the inspection are identified in the report. Within these

l

I

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities violated NRC require-

ments and other activities appeared to deviate from a commitment to the NRC. The

violations and deviations, with pertinent references and elements to be included

in your response, are presented in the enclosed Notices.

In addition to the need for corrective action regarding these specific violations,

we are concerned, as we stated during the Enforcement Conference, about the

1mplementation of your management control systems that permitted their

Additionally, a particular concern was management's delay of verifying

occurrence.

the operability of battery EVCA after being informed of the apparent surveillance

and maintenance discrepancies on February 1,1985. Consequently, in your reply,

you should describe in particular those actions taken or planned to improve the

effectiveness of your management control system.

Should you have any questions concerning this letter, please contact us.

Sincerely,

G%

-

,

t

t

JOH

,

J. Nelson Grace

Regional Administrator

Enclosures:

(See page 2)

8508290078 850815

DR

ADOCK 05000369

1

PDR

I

/

l

i\\\\

LE O '

.

.

_ _ _ _ ___

__

_ _ _ _

_

_ _ .

.

.

.

Duke Power Company

2

Enclosures:

1.

Notice of Violation

i

2.

Notice of Deviation

3.

Inspection Report Nos. 50-369/8E-10

and 50-370/85-11 w/ attachments

gc w/encis:

A . L. McConnell, Station Manager

bec w/encis:

/NRC Resident Inspector

Document Control Desk

State of North Carolina

k

-

iM5

4.g

s;r7;p

g

~

RII

.

RII

RII

RII

R

RII

RII ,p

W k

U

b

0

W

W0r8'ert:sa

HDance

VBrownlee

GJ

's

AHerd

RWalker

hJnski

07/g/85

07/g/85

07/ y85

07pf/85 07/23/85

g'j/85

07/ 3 /85

2

7

QA0 k

'

T