ML20134H650
| ML20134H650 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 08/15/1985 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20134H653 | List: |
| References | |
| TAC-59698, TAC-59699, NUDOCS 8508290078 | |
| Download: ML20134H650 (2) | |
See also: IR 05000207/2007003
Text
e
o$c;cl
,
o
,
s
.
AUG 151985
Duke Power Company
/ ATTN:
Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT:
REPORT NOS. 50-369/85-10 AND 50-370/85-11
On February 7 - July 3,1985, NRC inspected activities authorized by NRC License
Nos. NPF-9 and NPF-17 for your McGuire facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report. The NRC's concerns relative to the
inspection findings were discussed by Dr. J. Nelson Grace of this office and
Mr. H. B. Tucker of your office, in an Enforcement Conference held at the
l
Region II Office in Atlanta, Georgia on July 3, 1985.
1
Areas examined during the inspection are identified in the report. Within these
l
I
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities violated NRC require-
ments and other activities appeared to deviate from a commitment to the NRC. The
violations and deviations, with pertinent references and elements to be included
in your response, are presented in the enclosed Notices.
In addition to the need for corrective action regarding these specific violations,
we are concerned, as we stated during the Enforcement Conference, about the
1mplementation of your management control systems that permitted their
Additionally, a particular concern was management's delay of verifying
occurrence.
the operability of battery EVCA after being informed of the apparent surveillance
and maintenance discrepancies on February 1,1985. Consequently, in your reply,
you should describe in particular those actions taken or planned to improve the
effectiveness of your management control system.
Should you have any questions concerning this letter, please contact us.
Sincerely,
G%
-
,
t
t
JOH
,
J. Nelson Grace
Regional Administrator
Enclosures:
(See page 2)
8508290078 850815
DR
ADOCK 05000369
1
I
/
l
i\\\\
LE O '
.
.
_ _ _ _ ___
__
_ _ _ _
_
_ _ .
.
.
.
Duke Power Company
2
Enclosures:
1.
i
2.
Notice of Deviation
3.
Inspection Report Nos. 50-369/8E-10
and 50-370/85-11 w/ attachments
gc w/encis:
A . L. McConnell, Station Manager
bec w/encis:
/NRC Resident Inspector
Document Control Desk
State of North Carolina
k
-
iM5
4.g
s;r7;p
g
~
RII
.
RII
RII
RII
R
RII
RII ,p
W k
U
b
0
W
W0r8'ert:sa
HDance
VBrownlee
GJ
's
AHerd
RWalker
hJnski
07/g/85
07/g/85
07/ y85
07pf/85 07/23/85
g'j/85
07/ 3 /85
2
7
QA0 k
'
T