05000336/LER-1996-031, Forwards LER 96-031-00 Which Documents Event That Occurred at Mnps,Unit 2 on 961003.Commitments,listed

From kanterella
(Redirected from ML20134H080)
Jump to navigation Jump to search
Forwards LER 96-031-00 Which Documents Event That Occurred at Mnps,Unit 2 on 961003.Commitments,listed
ML20134H080
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/04/1996
From: Richardson P
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20134H082 List:
References
B15975, NUDOCS 9611130521
Download: ML20134H080 (2)


LER-1996-031, Forwards LER 96-031-00 Which Documents Event That Occurred at Mnps,Unit 2 on 961003.Commitments,listed
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition
3361996031R00 - NRC Website

text

"*g. gggg 107 Selden Street, Berlin, CT %037 Utilities $ystem Northeast Utilities Sede Company P.o. Box 270 l

Ilartford, CT 06141-0270 (203) 665-5000 November 4,1996 Docket No. 50-336 B15975 l

Re: 10 CFR 50.73(a)(2)(ii)(B)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 This letter fonuards Licensee Event Report (LER) 96-031-00, documenting an event that i

occurred at Millstone Nuclear Power Station, Unit No. 2 on October 3,1996. This LER is being l

submitted pursuant to 10 CFR 50.73(a)(2)(ii)(B).

i F

I l

The following are NNECO's commitments made within this letter. All other statements made within this letter are for information only.

B15975-01:

The review and analysis of this event is continuing. Efforts are ongoing to reanalyze the peak secondary side pressure for a Single MSIV Closure Event. The reanalysis of the design basis event will resolve the conditions described in this LER. The consequences of these potentially non-conservative assumptions on other design basis events will also be reviewed. As a result of the reanalyses, l

appropriate corrective actions will be implemented prior to restart to ensure that the plant response to these events is adequate.

l' B15975-02:

A supplemental LER will be issued to provide the results of the reanalyses and the resultant corrective actions before March 1, 1997.

l l

Very truly yours, l

NORTHEAST NUCLEAR ENERGY COMPANY l

bb P. M'. Richardson

/

mna gQ,[,

9611130521 961104 Director-Millstone Unit No. 2 PDR ADOCK 05000336 S

PDR 4.5*e page 2 l

U. S. Nucipar Reguistory Commission B15975/Paga 2

'e i

Attachment: LER 96-031-00 cc: