ML20134G482

From kanterella
Jump to navigation Jump to search
Responds to Transmitting Rev 21 to Security Plan. Concerns Which Still Need Resolution Addressed in Encl. Response Requested within 30 Days of Ltr Date.Encl Withheld (Ref 10CFR73.21)
ML20134G482
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 08/21/1985
From: Butler W
Office of Nuclear Reactor Regulation
To: Farrar D
COMMONWEALTH EDISON CO.
References
NUDOCS 8508260270
Download: ML20134G482 (3)


Text

p {

Docket Nos. 50-373/374 August 21,1985 Mr. Dennis L. Farrar Director of Nuclear Licensing l Commonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690

Dear Mr. Farrar:

SUBJECT:

LASALLE COUNTY STATION, UNITS 1 AND 2 - VITAL AREAS This is in response to your letter of May 24, 1985, which transmitted Revision 21 to the Security Plan to the LaSalle Station, Units 1 and 2. submitted under the provisions of 10 CFR 50.54(p). Review responsibility for this submittal was transferred to Headquarters from Region III on Jure 17, 1985.

The enclosure to this letter identifies concerns which still need resolution.

Items not discussed in the enclosure need no further response at this time.

k' lease respond to these concerns within 30 days of the date of this letter.

Should you have any questions related to this matter, please contact the safeguards reviewer, Mr. R. F. Skelton, at (301) 427-4770.

The enclosure to your letter contains Safeguards Information of a type specified in 10 CFR 73.21 and is being withheld from public disclosure. The enclosure to this letter also contains Safeguards Information and must be protected against unauthorized disclosure. The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely,

!cmare(s) contain(s)

UAFEGUARDS INFORMATION. n.= tron a Waiter R. Butier, Chief when separated from athh=4a. Licensing Branch No. 2 Division of Licensing

Enclosure:

As stated " VIOLATION OF PROTECTION REQUIREMENTS OF 10 CFR 73.21 SUBJECT TO CIVIL OR cc w/o enclosure: CRIMINAL PENALTIES" See next page DISTRIBUTION Docket File SSPB Rdg LB#2 Rdg RFSkelton NRC PDR PNoonan EHylton L PDR JGibson ABournia DCS DKers, R-III WButler y d

[Sff$thl>

Krfoonan:dm S :OL JGi son Sh HBefMw

. PH, t mis LB#

Oi n LB#2 LBf2 ABournia WButler e /l9/85 $/f/85 T /(o /85 f(/ 5 85 3 /85 g/p/85 f/g0/85 SAFERRDS NORMATION PN ** -

Docket Nos. 50-373/374 August 21,1985 Mr. Dennis L. Farrar Director of Nuclear Licensing Comonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690

Dear Mr. Farrar:

SUBJECT:

LASALLE COUNTY STATION, UNITS 1 AND 2 - VITAL AREAS This is in response to your letter of May 24, 1985, which transmitted Revision 21 to the Security Plan to the LaSalle Station, Units 1 and 2, submitted under the

..- provisions of 10 CFR 50.54(p). Review responsibility for this submittal was transferred to Headquarters from Region III on Jure 17, 1985.

The enclosure to this letter identifies concerns which still need resolution.

Items not discussed in the enclosure need no further response at this time.

Please respond to these concerns within 30 days of the date of this letter.

Should you have any questions related to this matter, please contact the safeguards reviewer, Mr. R. F. Skelton, at (301) 427-4770.

The enclosure to your letter contains Safeguards Information of a type specified in 10 CFR 73.21 and is being withheld from public disclosure. The enclosure to this letter also contains Safeguards Information and must be protected against unauthorized disclosure. The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, M esure(s) containts) 5AFEGUARDS INFORMATION. me=tanea Waiter R. Butler, Cnief thec separated from atteoluments. Licensing Branch No. 2 Division of Licensing

Enclosure:

As stated " VIOLATION OF PROTECTION REQUIREMENTS OF 10 CFR 73.21 SUBJECT TO CIVIL OR cc w/o enclosure: CRIMINAL PENALTIES" See next page DISTRIBUTION l Docket File SSPB Rdg LB#2 Rdg RFSkelton NRC PDR PNoonan EHylton L PDR JGibson ABournia DCS DKers, R-III WButler

@SEffdLs Rtfoonan:dm S JL JGilson Sh llBetMw P4Hfr m/s .

LB Of n LB#2 LBf2 ABournia WButler t /M/85 $/f/85 Yi/f /85 ff/$85 3 /85 C 6 /3G85 f /2.4)/85 SAFEGllARDS INFORMATION

Fr. Dennis L. Farrar La Salle County I!Lclear Fower Stotion Commonwealth Edison Ccmpany Lnits 1 & 2 CC' Philip P. Steptce, Esquire John 11. f'cCaffrey Suite 4200 Chief, Public Utilities Division une First lietional Pitza 100 North La Salle Street, Roon 900 Chicago, Illinois 60603 Chicago, Illinois 60601 i Assistant Attorney General 168 Ilest Randolph Street Suite 2315 Chicago, Illinois 60601 Resident Inspector /LaSalle,l.FS U.S. fluclear Regulatory Connission

..~

Rural Route No. 1 Post 0Ffice Box 224 Marseilles, Illirois 61341 Chaircan Lo Salle County Board of Supervisors La Salle County Courthouse Ottawa, Illinois 61350 Attorney General 500 South 2nd Street-Springfield, Illinois 62701 Chairman Illinois Cornerce Connission Leland Building -

527 East Capitol Avenue Springfield, Illinois 62706 Mr. Gary N. ilright,11anager fiuclear Facility Safety Illinois Department of Nuclear Safety 1035 Outer Park Drive, 5th Floor Springfield, Illinois 62704 Regional Administrator, Regicn III U. S. fiuclear Regulatory Commission 799 Rossevelt Road Glen Ellyn, Illinois 60137 I

_ ._ -