ML20134F731

From kanterella
Jump to navigation Jump to search
Forwards Rev 7 to Topical Rept - 066, Oyster Creek Cycle 16 Colr
ML20134F731
Person / Time
Site: Oyster Creek
Issue date: 10/31/1996
From: Keaten R
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20134F734 List:
References
6730-96-2325, NUDOCS 9611070204
Download: ML20134F731 (1)


Text

_.

s 8

{

GPU Nuclear,lnc.

(

One Upper Pond Road NUCLEAR Parsippany NJ070541095 Tel 201316-7000 6730-96-2325 October 31,1996 US Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555

Dear Sir:

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Facility License No. DPR-16 i

Core Operating Limits Report (COLR) Revision J

As required by Technical Specification 6.9.1.f.4, a revision to the COLR for Oyster Creek Cycle i

16 operation is attached for NRC staffinformation.

This COLR revision (Revision 7) contains a change to the minimum critical power ratio operating limit from 1.51 to 1.53 based on the turbine trip without bypan transient evaluated in the reload core design for Cycle 16. Core operating limits for Cycle 16 are based on a revised safety limit 1

minimum critical power ratio of 1.09. A SLMCPR of 1.07, however, remains valid until mid-cycle.

i Very tmly yours, R. W. Keaten Vice President & Director Engineering

\\

RWK/PFC c:

Administrator, USNRC Region 1 Senior USNRC Resident Inspector g6 Oyster Creek USNRC Project Manager fI 9611070204 961031 PDR ADOCK 05000219 P

PDR i