Docket No. 50-293
I
Boston Edison Company M/C Nuclear
(
ATIN:
Mr. William D. Harrington
Senior Vice President, Nuclear
l
!
800 Boylston Street
Boston, Massachusetts 02199
l
Gentlemen:
Subject:
Inspection No. 50-293/85-21
l
l
This refers to the special safety inspection conducted by Dr. M. McBride of this
l
office on July 16, 1985 through July 30, 1985, at the Pilgrim Nuclear Power Station,
i
Plymouth, Massachusetts regarding your response to abnormal surveillance test re-
l
sults and to discussions of our findings held with Mr. C. Mathis at the conclusion
of the inspection.
Dased on the results of this inspection, we are concerned about repetitive examples
l
wherein plant equipment failed survelliance testing without proper notification
l
of operations personnel as required by procedures.
As a result, the affected
equipment was not properly declared inoperable and initiation of prescribed cor-
l
rective actions was delayed.
Consequently, there was an apparent violation of a
l
Limiting Condition for Operation on one occasion and surveillance testing required
l
by the technical specifications was not promptly initiated on a second occasion.
It appears that a programmatic breakdown in your administrative controls has oc-
curred.
An enforcement conference has been scheduled for August 27, 1985 at the Region I
office to further discuss these problems.
At this conference you should be pre-
i
pared to discuss your critique of these events and the corrective actions taken.
The need for and nature of appropriate enforcement action relative to the issues
discussed in the enclosed report will be considered after this conference and will
be the subject of separate correspondence at a later time.
Your cooperation with us in this matter is appreciated.
SI"CU"IY'
Original Signed Byl
'j
,f,
}A
bU
Richard W. Starostecki, Director
T"
DivisionofReactorProjects
8
Enclosure:
NRC Region ! Inspection Report 50-293/85-21
0500200340 HSC813
PDN
ADOCM 05000293
1
0
pm
-[d /
l
!
p
i
3
I
l
.
,
Boston Edison Company M/C Nuclear
2
AUG13 N
,
l
cc w/ enc 1:
A. V. Morist, Manager, Nuclear Management Services Department
C. J. Mathis, Station Manager
Joanne Shotwell, Assistant Attorney General
Paul Levy, Chairman, Department of Public Utilities
i
W. F. Nolan, Chairman, Plymouth Board of Selectmen
Plymouth Civil Defense Director
Senator Edward P. Kirby
Pubite Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Massachusetts (2)
i
bec w/ enc 1:
Region I Docket Faom (with concurrences)
'
DRP Section Chief
1
(
d:I(M
P
-
jR28P
RI:dDP,6
flu
,i
,
f
'
0
ride /meo
hipp
Wenringer
S L pfost
/
/2/85
glc{
' { l1
0FFICIAL RECORD COPY
.--
-.
- -
- - . .
- - -
-
- - -
- - - - - - -
-
-
. -