Forwards Insp Rept 50-333/85-13 on 850429-0503.No Violations Noted.Efforts to Reduce Drawing Rev Backlog & to Provide Better Control of Drawings Initiated in Response to Insp Rept 50-333/82-24 Found Unsatisfactory
ML20134E618
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 08/14/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Glovier H
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20134E621 List:
References
NUDOCS 8508200347
Download: ML20134E618 (2)


See also: IR 05000333/1985013

Text

-

)

,

.

AUG 141985

Docket No. 50-333

Power Authority of the State of New York

James A. FitzPatrick Nuclear Power Plant

ATTN: Mr. Harold A. Glovier

Resident Manager

P. O. Box 41

Lycoming, New York 13093

Gentlemen:

Subject:

Inspection Report No. 50-333/85-13

This refers to the routine inspection conducted by W. Oliveira of this office

on April 29 - May 3,1985, at the James A. FitzPatrick Nuclear Power Plant,

Scriba, New York of activities authorized by NRC License No. DPR-59 and to the

discussions of our findings held by Dr. P. K. Eapen with yourself at the con-

clusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspec-

tion Report which is enclosed with this letter. Within these areas, the in-

spection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were identified. However,

our inspectors noted that the actions you have initiated to address the concerns

identified in NRC Operational Assessment Team Inspection (No. 50-333/82-24) were

not completed as planned.

Examples of these actions included the efforts to

reduce the drawing revision back log as stated in JAFP letter 82-0869 dated

August 6, 1982 and the efforts to revise Plant Standing Order No. 5 to provide

better control for the plant drawings and technical manuals. Therefore, you art .

requested to review the status of the actions you have initiated in response to

'

the concerns identified in NRC Inspection Report No. 50-333/82-24 and provide a

written status report to this office within thirty days of the receipt of this

letter.

The response requested by this letter is not subject to the clearance proce-

dures of the office of Management and Budget as required by the Paperwork

'

Reduction Act of 1980, PL 96-511.

Your cooperation with us in this matter is appreciated.

-

Sincerely,

Original Signed Byf

[y

4

tewart D. Ebneter, Director

,

3

1

Division of Reactor Safety

G

4

0FFICIAL RECORD COPY

IR FITZPATRICK - 0001.0.0

08/13/85

..

.

New York Power Authority

2

Enclosure: NRC Region I Inspection Report No. 50-333/85-13

.

"cc w/ encl:

L. Sinclair, President

J. Bayne, First Executive Vice President and Chief Operations Officer

A. Klausmann, Vice President - Quality Assurance and Reliability

R. Patch, Quality Assurance Superintendent

George M. Wilverding, Chairman, Safety Review Committee

Gerald C. Goldstein, Assistant General Counsel

NRC Licensing Project Manager

Dept. of Public Service, State of New York

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New York

bec w/ enc 1:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encis)

J. Linville, Chief, Section #2C, RB #2, DRP

RI:DRS

R

RS

R: RS

RI:

01 eira/mmb

Eapen

Bettenhausen

Eb ter

'f 0

/

13

t

'

.

OFFICIAL RECORD COPY

IR FITZPATRICK - 0002.0.0

08/13/85