Proposed Tech Specs 3.4.6.1,incorporating Proposed Change Re Reactor Coolant Leakage Detection Sys
ML20134E245
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/23/1996
From:
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20134E239 List:
References
NUDOCS 9611010065
Download: ML20134E245 (3)


Text

-

l

  • I ATTACHMENT 3 PROPOSED REPLACCJENT PAGE FOR CHANGE TO l

TECHNICAL SPECIFICATIONS l

l i

l I

j i

I l

r I

I 9611010065 961023 PDR ADOCK 05000498 PDR l

p

{0 c e la ! Y h [o llOlai n

\\REACTORCOOLANTSYSTEM 4.6 REACTOR COOLANT SYSTEM LEAKAGE LEAKA DETECTION SYSTEMS 11tillit[G DITION FOR OPERATION 3.4.6.1 The 110 wing Reactor Coolant System Leakage 0 ection Systems shall be OPERABLE:

a.

The Cont 'nment Atmosphere Gaseous Radio ivity Monitoring System, b.

The Contain nt Normal Sump Level and ow Monitoring System, and c.

The Containme Atmosphere Particul Radioactivity Monitoring System.

APPLICABILITY:

MODES 1, 2, and 4.

ACTION:

a.

With a. or c. of the abo required Leakage Detection Systems in-operable, operation may inue for up to 30 days provided grab 1

samples of the contain nt a osphere are obtained and analyzed for gaseous and particula radio tivity at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when the required Gaseou or Particu te Radioactive Monitoring System is 4

inoperable; otherw' e, be in at ast HOT STANDBY within the next

, (

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in C SHUTDOWN withi the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b.

With b. of th above required Leakage etection Systems inoperable, be in at lea HOT STANDBY within the n t 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUT-i DOWN.withi he following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

c.

With a.

d c. of the above required Leakage etection Systems inoper le:

1) estore either Monitoring System (a. or c.) o OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and Obtain and analyze a grab sample of the contai nt atmosphere for gaseous and particulate radioactivity at least on per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and 3)

Perform a Reactor Coolant System water inventory ba ce at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

Otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in LD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REOUIREMENTS 4.4.6.1 The Leakage Detection Systems shall be demonstrated OPERABLE by:

a.

Containment Atmosphere Gaseous and Particulate Monitoring Systems performance of CHANNEL CHECK, CHANNEL CALIBRATION, and DIGITAL CHANNEL OPERATIONAL TEST at the frequencies specified in Table 4.3-3, and

(

b.

Containment Normal Sump Level and Flow Monitoring System performance of CHANNEL CALIBRATION at least once per 18 months.

SOUTH TEXAS - UNITS 1 & 2 3/4 4-19

e s

O REACTOR COOLANT SYSTEM 3/4.4.6 REACTOR COOLANT SYSTEM I F AKAGE IRAKAGE DETECTION SYSTEMS LIMITING CONDITION FOR OPERATION 3.4.6.1 The following Reactor Coolant System Leakage Detection Instrumentation shall be OPERABLE:

One Containment Atmosphere Radioactivity Monitor (gaseous or particulate), and a.

b.

The Containment Normal Sump Level and Flow Monitoring System.

APPLICABILITY: MODES 1,2,3, and 4.

l ACTION:

l With the required containment atmosphere radioactivity monitor inoperable:

l a.

1)

Restore one containment atmosphere radioactivity monitoring system to OPERABLE status within 30 days and, 2)

Obtain and analyze a grab sample of the containment atmosphere for gaseous and particulate radioactivity at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or 3)

Perform a Reactor Coolant System water inventory balance at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

l l

b.

With the required containment normal sump and flow monitoring system inoperable:

1)

Restore the containment normal sump and flow monitoring system to OPERABLE status within 30 days and, 2)

Perform a calculation of sump inflow leak rate at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or t

3)

Perform a Reactor Coolant System water inventory balance at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

L Otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the I

following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

L SURVEILLANCE REQUIREMENTS 4.4.6.1 The Leakage Detection Systems shall be demonstrated OPERABLE by:

I Containment Atmosphere Gaseous and Particulate Monitoring Systems performance of a.

CHANNEL CHECK, CHANNEL CALIBRATION, and DIGITAL CHANNEL 4

OPERATIONAL TEST at the frequencies specified in Table 4.3-3, and i

b.

Containment Normal Sump Level and Flow Monitoring System performance of CHANNEL l

CAllBRATION at least once per 18 months.

l SOUTH TEXAS - UNITS 1 & 2 3/4 4-19

-.