ML20134E245
| ML20134E245 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 10/23/1996 |
| From: | HOUSTON LIGHTING & POWER CO. |
| To: | |
| Shared Package | |
| ML20134E239 | List: |
| References | |
| NUDOCS 9611010065 | |
| Download: ML20134E245 (3) | |
Text
-
l
- I ATTACHMENT 3 PROPOSED REPLACCJENT PAGE FOR CHANGE TO l
TECHNICAL SPECIFICATIONS l
l i
l I
j i
I l
r I
I 9611010065 961023 PDR ADOCK 05000498 PDR l
p
{0 c e la ! Y h [o llOlai n
\\REACTORCOOLANTSYSTEM 4.6 REACTOR COOLANT SYSTEM LEAKAGE LEAKA DETECTION SYSTEMS 11tillit[G DITION FOR OPERATION 3.4.6.1 The 110 wing Reactor Coolant System Leakage 0 ection Systems shall be OPERABLE:
a.
The Cont 'nment Atmosphere Gaseous Radio ivity Monitoring System, b.
The Contain nt Normal Sump Level and ow Monitoring System, and c.
The Containme Atmosphere Particul Radioactivity Monitoring System.
APPLICABILITY:
MODES 1, 2, and 4.
ACTION:
a.
With a. or c. of the abo required Leakage Detection Systems in-operable, operation may inue for up to 30 days provided grab 1
samples of the contain nt a osphere are obtained and analyzed for gaseous and particula radio tivity at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when the required Gaseou or Particu te Radioactive Monitoring System is 4
inoperable; otherw' e, be in at ast HOT STANDBY within the next
, (
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in C SHUTDOWN withi the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b.
With b. of th above required Leakage etection Systems inoperable, be in at lea HOT STANDBY within the n t 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUT-i DOWN.withi he following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
c.
With a.
d c. of the above required Leakage etection Systems inoper le:
1) estore either Monitoring System (a. or c.) o OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and Obtain and analyze a grab sample of the contai nt atmosphere for gaseous and particulate radioactivity at least on per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and 3)
Perform a Reactor Coolant System water inventory ba ce at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
Otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in LD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REOUIREMENTS 4.4.6.1 The Leakage Detection Systems shall be demonstrated OPERABLE by:
a.
Containment Atmosphere Gaseous and Particulate Monitoring Systems performance of CHANNEL CHECK, CHANNEL CALIBRATION, and DIGITAL CHANNEL OPERATIONAL TEST at the frequencies specified in Table 4.3-3, and
(
b.
Containment Normal Sump Level and Flow Monitoring System performance of CHANNEL CALIBRATION at least once per 18 months.
SOUTH TEXAS - UNITS 1 & 2 3/4 4-19
e s
O REACTOR COOLANT SYSTEM 3/4.4.6 REACTOR COOLANT SYSTEM I F AKAGE IRAKAGE DETECTION SYSTEMS LIMITING CONDITION FOR OPERATION 3.4.6.1 The following Reactor Coolant System Leakage Detection Instrumentation shall be OPERABLE:
One Containment Atmosphere Radioactivity Monitor (gaseous or particulate), and a.
b.
The Containment Normal Sump Level and Flow Monitoring System.
APPLICABILITY: MODES 1,2,3, and 4.
l ACTION:
l With the required containment atmosphere radioactivity monitor inoperable:
l a.
1)
Restore one containment atmosphere radioactivity monitoring system to OPERABLE status within 30 days and, 2)
Obtain and analyze a grab sample of the containment atmosphere for gaseous and particulate radioactivity at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or 3)
Perform a Reactor Coolant System water inventory balance at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
l l
b.
With the required containment normal sump and flow monitoring system inoperable:
1)
Restore the containment normal sump and flow monitoring system to OPERABLE status within 30 days and, 2)
Perform a calculation of sump inflow leak rate at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or t
3)
Perform a Reactor Coolant System water inventory balance at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
L Otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the I
following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
L SURVEILLANCE REQUIREMENTS 4.4.6.1 The Leakage Detection Systems shall be demonstrated OPERABLE by:
I Containment Atmosphere Gaseous and Particulate Monitoring Systems performance of a.
CHANNEL CHECK, CHANNEL CALIBRATION, and DIGITAL CHANNEL 4
OPERATIONAL TEST at the frequencies specified in Table 4.3-3, and i
b.
Containment Normal Sump Level and Flow Monitoring System performance of CHANNEL l
CAllBRATION at least once per 18 months.
l SOUTH TEXAS - UNITS 1 & 2 3/4 4-19
-.