NIAGARA b!0llAWK POWER CORPORATION NINE b!ILE POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE The station operated during the month of July 1935 with a Unit Availability Factor of 100.0% and a Net Design Electrical Capacity Factor of 93.9%. There were 0 challenges to Electromatic Relief Valves. Reductions in Capacity Factor were due to seasonally warm circulating water temperatures and a load reduction to adjust control rod pattern.
CLASS I WORK - h!ECilANICAL b!AINTENANCE - JULY 1985 hR# 33431 94-01 Inst. Air Comp - replaced Blowdown Valve hR# 32653
- 114 FW litr - installed Temp. shield collar hR# 33448 210-03 Control Room Emergency Vent - replaced filter hR# 30180 210-01 #11 Control Room Cire. Fan - replaced bearing blocks and motor-hR# 30925 100.1 pipe supports - comp as per letter from P. Scorge CLASS I WORK - ELECTRICAL h!AINTENANCE - JULY 1985 hR# 33549 210-39A Control Room Vent System Position Indicator.
Lubricated Switch.
hR# 33594 Core Spray Vent I.V.121.
Replace coil wire.
CLASS I WORK - INSTRUh!ENTATION 6 CONTROL - JULY 1985 hR# 33374 LoLoLo 36-05A current too high (Readjusted high current gross failure pot.)
hR# 33617 Emergency Condenser 121 6 122 on shutdown panel #12 oscillates rapidly rhile control room indicator does not. (Replaced C1 ar.d C2 power supply filters.)
- 14 APRhl Rod block setting out of adjustment.
(Adjusted per NISP3.1) 85081904968507h220^
1 gDR ADOCK 0500 PDR' T[,)
- l I/t
OPERATING DATA REPORT DOCKET NO.
50-220 I
DATE 8]S485.
l.'
COMPLETED BY Mi-si TELEPHONE 349c2422-OPERATING STATUS g, g,;g % Nine Mile Point Unit I Notes l
- 2. Reporting Period:
7/1/85 TO 7/31/85 i1
- 3. Licensed Thermal Power (MWt):
1850 e!
- 4. Nameplate Rating (Gross MWe):
640
[;
- 5. Desagn Electrical Rating (Net MWe):
620
!l
- 6. Maximum Dependable Capacity (Gross MWe):
630 610
- 7. Maximum Dependable Capscity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
d
- 9. Power Level To Which Restricted. lf Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr. to.Date Cumulative
- 11. Hours in Reporting Period 744 5.087 139,152.2 l
- 12. Number Of Hours Reactor Was Critical 744 5,057.1 97,772.8
- 13. Reactor Reserve Shutdown Hours 0
0 1,204.3
- 14. Hours Generator On.Line 744 5.042.3 94,847.6
- 15. Unit Reserve Shutdown Hours 0-0 20.4
- 16. Gross Thermal Energy Generated (MWH) 1.368.331.0 9,123,707 158.413.157
- 17. Gross Electrical Energy Generated (MWH) 446.632,_,
3,076,754 52.457.542
- 18. Net Electrical Energy Generated (MWH)-
433.053 2,985,719 50.815.713
- 19. Unit Service Factor 100.0 99.1 68.2
- 20. Unit Availability Factor 100.0 99.1 68.2
- 21. Unit Capacity Factor (Using MDC NetI 95.4 96.2 59.9
- 22. Unit Capacity Factor (Using DER Net) 93.9 94.7 58.9
- 23. Unit Forced Outage Rate 3.0 3.0 3.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Each t:
- 25. If Shut Down At Emi Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (4/77I
-.,-,-4
.m 7
--w.
,yv-,--.
v..e..
.y---+-
~
AVER \\GE D AILY L*N!T POhER LEVEL DOCKET NO.
50-220 LWIT _9 Milo Pt. #1 I
DATE 8/8/85 m
i CostPLETED !!Y es- -
TELEPil0NE 34[-2422 MONTH July 1985 DAY
' AVERACE DAILY POWER LEVEL, DAY AVER AGE DAILY POWER LEVEL IMhe Nett g yw,.3,,,
I 595 37 585 l
-2 593 l
s 581 l
3 591 39 577 4
588 20 577 5
588 578 6
588 576 7
583 23 579-3 586 24 580 9
585 25 582.
10 584
'6 579.
11 583 27 548 12 585
- s 579 13 586 29 578 l
14 585 30 576 15 585 33 580 16 583 INSTRUCTIONS l
On this format.hst the aserage daily unit p.iwer lesci m MWe. Net for each day in the re;i..irmy m..n neartst wholf meg 2w3tt.
o-e-
,4 6
UNITSHUTDOWNS AND POWER REDUCHONS DOCKET NO. 50-220 UNIT NAME 4 Wla P"-
- 1 DATE 8/8/85
/
REPORT MONTig July 1985 COMPLETED BY Wed h '
TELEPHONE 349-2 @
e.
E E
.!?
3 jYh Licensee
,E*
je.
Cause & Corrective No.
Ibse c-72 M
2:&
Event uT a?
Action to 4
j@
j$g Report a N0
[0 Prevent Recurrence c5 85-11 850727 20 11 Load Reduction To 75% For Control Rod Pattern Adjustment I
2 3
4 F: Forced Reason:
Method:
Exhibit C Instructions 5: Scheduled A Equipment Failure (Explain)
I-Manual for Prepasation of Data B-Maintenance ni Test 2-Manual Sciam.
Entry Sheets for Licensee C. Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 44)ther (Explain) 0161)
E-Operator Training & License Examination F.Adnenistrative 5
G-Operational E:rus (Explain)
Exhibis 1 - Same Source r8/77) 11-O:her (Explain)
W 4
NMP-13402 NIAGARA MOHAWK POWER CORPORATION NI AGAR A MOHAWK 300 ERIE SOULEVARD. WEST SYRACUSE, N. Y.13202 August 7, 1985 i
Direc. tor
. Of fice of Inspection and Enforcement U.S. Nuclear Regulatorij Commission Washington, DC 20555 Attn:
Occument and Controi Desk Re: 00cket No. 50-220 DPR-63
Dear Sir:
Submitted herentith is the Report of Operating Statistics and shutdown for Juitj 1985 for the Nine Mile Point Nuclear Station U. tit M1.
At:,o included is a narrative report of Operating Exper.ience for July 1985.
Very thuitj yours,
'ff Thomas E. Lempges Vice President Nuclear Generation TEL/tg AttacInnenta cc: Director, Of fice of ISC i10 copies)