05000336/LER-1996-043, Fowards LER 96-043-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 961231.Util Commitments Made within Ltr,Listed

From kanterella
(Redirected from ML20134D795)
Jump to navigation Jump to search
Fowards LER 96-043-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 961231.Util Commitments Made within Ltr,Listed
ML20134D795
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/30/1997
From: Price J
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20134D798 List:
References
B16177, NUDOCS 9702050375
Download: ML20134D795 (2)


LER-2096-043, Fowards LER 96-043-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 961231.Util Commitments Made within Ltr,Listed
Event date:
Report date:
3362096043R00 - NRC Website

text

- , _ , _ - , . . _ _ .m_ . _. . _ _ _ _ _ _ - _ _ _ . - . . . . _ . _ . _ _

i

,g . 'hg Millstone Offices

  • Hope Ferry Rd., Waterford, CT j

- Utilities System P.o.n, 128  !

$ Waterford, CT 06385-0128  !

i (203) 447-1791 i

January 30,1997 )

[

Docket No. 50-336 B16177 l

)

i Re: 10 CFR 50.73(a)(2)(i) I' 4

e i

l U.S. Nuclear Regulatory Commission  !

Document Control Desk j 4 Washington, DC 20555  !

[ This letter forwards Licensee Event Report (LER) 96-043-00, documenting an event

. that occurred at Millstone Nuclear Power Station, Unit No. 2 on December 31,1996.

This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(i).

l The following are NNECO's commitments made within this letter. All other statements made within this letter are for information only. q i B16177-01: Design calibration calculations for QA/ Safety Related orifice plates will be verified and a sample of these calculations will be checked to ensure they are consistent with calibration documentation. This will be completed before entry into Mode 4.

i s

Very truly yours, i

! NORTHEAST NUCLEAR ENERGY CCMPANY

$am .

bb ss oc, t e le/~,

gb J. A. Pripe ~

Director - Millstone Unit No. 2 I

l cc: see page 2 9702050375 970130 f 3EN l PDR ADOCK 05000336. 4 S ,

PDR 3 063422-9 REV.1-95

- . . - .. --. _.. . .. .. . _ = - _ . _ - - . . . .. _ - - - . .. . .

. U. S. Nucirr Rtgulatory Commission

. B16177/Page 2

Attachment:

LER 96-043-00 cc: W. D. Travers, Director of Special Projects .

H. J. Miller, Region l Administrator

{

D. P. Beaulieu, Senior Resident inspector (Acting), Millstone Unit No. 2  !

D. G. Mcdonald, Jr., NRC Project Manager, Millstone Unit No. 2 (

i c

i l

l l

i l

.