___ _ _ -
put k
UNITED STATES g
t g
j NUCLEAR RESULATORY COMM10810N g,*****j&
WASHINGTON, D.C. 20006 4 001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION 1
l RELATED TO AMENDMENT NOS.120 AND 84 TO FACILITY OPERATING l
LICENSE NOS. NPF-39 AND NPF-85 i
PHILADELPHIA ELECTRIC COMPANY LIMERICK GENERATING STATION. UNITS 1 AND 2 DOCKET NOS. 50-352 AND 50-353 i
i
1.0 INTRODUCTION
l By letter dated March 29, 1996, as supplemented by letters dated December 5, l
1996, and January 15, 1997, the Philadelphia Electric Company (the licensee) submitted a request for changes to the Limerick Generating Station, Units 1 i
and 2, Technical Specifications (TSs).
The requested changes would modify the i
i Automatic Depressurization System (ADS) safety / relief valve (S/RV) Technical Specification (TS) surveillance requirement to perform functional testing once every 24 months as part of start-up testing activities. The specific TS change evaluated herein is for TS Surveillance Requirement (SR) 4.5.1.d.2.b.
l The December 5, 1996, and January 15, 1997, letters provided clarifying i
information that did not change the initial proposed no significant hazards l
consideration determination nor the initial Federal Reoister notice.
i j
2.0 BACKGROUND
I Each plant S/RV is a Target Rock 2-Stage pilot operated S/RV with an attached t
pneumatic actuator.
There are a total of 14 S/RVs installed on each of the Limerick 1 and 2 main steam systems.
Five of these valves serve the ADS function which is to reduce reactor pressure during a small break LOCA or i
after containment isolation, in the event that the High Pressure Coolant i
Injection (HPCI) system and/or the Reactor Core Isolation Cooling (RCIC) l system fail to maintain adequate reactor pressure vessel water level. The ADS i
function is accomplished by an automatic control circuit that applies electric
]
power to solenoids which provide control air to the pneumatic diaphragm i
assembly (i.e., auxiliary actuating device) that removes the pilot spring j
force allowing the pilot disk to open. Once the pilot disk is open, steam j
pressure provides the necessary force to open the main S/RV disk.
Currently, the Limerick 1 and 2 TS SR 4.5.1.d.2.b requires that, at least once every 24-months, the ADS S/RVs undergo manual in-situ functional exercise i
testing as part of startup activities following an outage. This testing is i
typically performed at 500 psig. The licensee considers this testing to impose an unnecessary challenge on the ADS S/RVs and has linked this testing i
to S/RV leakage of both the pilot and main stages of the valves. The licensee l
has provided several examples of instances where these S/RVs began to leak after the in-situ stroke testing was performed. The licensee states that, if i
the pilot stage leakage is severe enough, the S/RV setpoint could drift, l;
9702040289 970129 PDR ADOCK 05000352 P
t,
i leading to spurious actuation and/or failure of the valve to reseat. The licensee also states that this scenario has actually occurred at Limerick and at other BWRs having similar S/RVs.
l 3.0 PROPOSED TECHNICAL SPECIFICATION CHANGES The licensee proposes to perform the surveillance of the ADS S/RV function without physically stroking the main disks of the valves.
The proposed TS change would revise the wording in TS SR 4.5.1.d.2.b to delete the requirement to perform the in-situ testing and would provide a requirement to verify that the valves are tested pursuant to TS Section 4.0.5, which pertains to inservice inspection and testing of American Society of Mechanical Engineers (ASME) Code Class 1, 2, and 3 components. The ASME testing verifies that each i
ADS valve is capable of being opened by performing the following testing:
4 Division 1 and 3 ADS logic system functional testing as required by TS a.
Sections 3.3.3 and 4.5.1.d.2.a which verifies the Emergency Core Cooling System (ECCS) logic for actuating the ADS, not including actual stroking Sf the instrument gas / accumulator solenoids.
b.
A test which verifies proper operation of the ADS solenoid valves, air operator, and pilot assembly each refueling cycle and each time maintenance is performed on the valves.
c.
An ADS leak test, also performed each refueling cycle and each time maintenance is performed on the ADS valve, which verifies that ADS instrument gas / accumulator leakage is low enough to ensure adequate pneumatic pressure for design-basis ADS S/RV operation.
d.
S/RV setpoint and leakage testing, performed on at least 50% of the S/RV pilot stages each refueling outage, which verifies the pilot setpoints and that leakage is within strict limits.
e.
A new main disk exercise test, performed on at least two S/RVs per unit each refueling cycle and on all 14 S/RVs per unit within 7 operating cycles, which ensures that the main disks can freely open.
As justification for not performing the current TS-required in-situ S/RV main stage disk exercising, the licensee emphasized that there has never been an inservice occurrence where a Target Rock S/RV stage main disk did not stroke after the pilot stage was actuated. The few times that the main disk did not stroke have occurred during limited flow testing on a test stand, which does not reflect the conditions of actual in-situ operation. Also, the licensee stated that, in addition to the required surveillance tests-described above, the S/RVs are routinely inspected as recommended by General Electric Company's Service Information Letter (SIL) No. 196, " Summary of Recommendations for Target Rock Steam Safety / Relief Valves." This involves refurbishing and setpoint testing of the entire S/RV assembly on a sampling basis during each fuel cycle as part of routine S/RV preventive maintenance.
In the submittal dated December 5, 1996, the licensee described in more detail the preventive
i 4
i maintenance program for these components. Currently, the licensee maintains all 14 plant S/RV main bodies (for each unit) over approximately three i
refueling cycles. This maintenance includes disassembly, inspection, and occasional replacement of necessary parts, followed by stroking of the main disk with steam and a test for leakage.
4.0 EVALUATION The staff has reviewed the licensee's proposed TS changes and agrees that the l
current TS requirement to perform the in-situ stroke testing of the ADS S/RVs may contribute to undesirable valve seat leakage in either the pilot or main i
valve stages and could result in spurious actuation of the valves during power i
operation and/or failure to reseat. The testing proposed by the licensee l
provides periodic verification of the individual ADS S/RV components and includes:
testing of the ADS logic, solenoid valves, air operator, and pilot i
assembly; leak testing of the ADS instrument gas / accumulator; setpoint testing of 50% of the pilot stages each refueling; main disk exercising of two S/RVs each refueling outage; and routine preventive maintenance, inspection, refurbishment, and stroking of the main stages. The staff agrees that the i
proposed surveillance and testing of the ADS S/RVs and associated components j
provide adequate assurance of proper valve operation.
One difference between the current TS required stroking of the ADS S/RV main i
stages during plant startup and the licensee's proposal is that, with the l
proposed testing, there would be less frequent stroking of the S/RV main i
stages. The staff notes that the preventive maintenance schedule currently performed would ensure that the main stages are capable of operating by actua ly moving the disks at a frequency of approximately every 6 years (or three refueling cycles).
If the licensee should determine that less frequent maintenance is necessary in the future (e.g., because the valve leakage improves), the time period between main disk stroke verifications could be j
extended. However, because the main stage disks of these valves are very reliable, as demonstrated by the good performance history of the main stages 4
of Target Rock S/RVs at BWR plants, the staff agrees that the proposed i
verification of a minimum of two main stage disks each refueling is adequate.
Another difference between the current TS-required stroking and the licensee's proposal is that, when performing the testing in-situ as required by the current TSs, the testing verifies that the S/RV discharge line is not blocked.
l However, the licensee stated that there is a Foreign Material Exclusion (FME) l Program in place at the plant which minimizes the potential of debris blocking i
the discharge lines such that the possibility of blockage is extremely remote.
The staff agrees that there is a very small possitsility of blockage of an S/RV discharge line as demonstrated by operational history and agrees that the licensee has acceptably addressed this concern.
.a 5
. 5.0
SUMMARY
Based on the above evaluation, the staff concludes that the licensee has adequately demonstrated the adequacy of the proposed changes to the Limerick Units 1 and 2 TSs.
The proposed changes provide for testing of the ADS S/RVs to demonstrate proper operation without the need for in-situ stroking of the main disk stages of the valves. Therefore, the proposed changes to TS SR 4.5.1.d.2.b for Limerick, Units 1 and 2, are acceptable.
l
6.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Pennsylvania State official was notified of the proposed issuance of the amendments. The State official had no comments.
7.0 ENVIRONMENTAL CONSIDERATION
i The amendments change the surveillance requirements. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure.
The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding (61 FR 57488). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
8.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that:
(1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such acti rities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: G. Hammer Date: Janaury 29, 1997
>