ML20134D066
| ML20134D066 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 01/29/1997 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | Philadelphia Electric Co |
| Shared Package | |
| ML20134D069 | List: |
| References | |
| NPF-39-A-120, NPF-85-A-084 NUDOCS 9702040283 | |
| Download: ML20134D066 (8) | |
Text
'
arrog
- g k
UNITED STATES f,i g
j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 3066H001
\\..... j/
~
PHILADELPHIA ELECTRIC COMPANY DOCKET NO. 50-352 LIMERICK GENERATING STATION. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.120 License No. NPF-39 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Philadelphia Electric Company (the licensee) dated March 29, 1996, as supplemented by letters dated December 5, 1996, and January 15, 1997, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the dommon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
9702040283 970129 PDR ADOCK 05000352 P
i.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-39 is hereby amended to read as follows:
Technical Soecifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 120, are hereby incorporated into this license.
Philadelphia Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION j
r i
J n F. Stolz, Director ect Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: January 29, 1997
1 ATTACHMENT TO LICENSE AMENDMENT NO. 120 FACILITY OPERATING LICENSE NO. NPF-39 DOCKET NO. 50-352 Replace the following page of the Appendix A Technical Specifications with the attached page. The revised page is identified by Amendment number and contains vertical lines indicating the area of change.
Remove Insert 3/4 5-5 3/4 5-5 l
i I
y f
4 i
, EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 1 j
2.
For the HPCI system, verifying that:
j a)
The system develops a flow of at least 5600 gpm against a test line pressure corresponding to a reactor vessel pressure 4
of a 200 psig plus head and line losses, when steam is being supplied to the turbine at 200 + 15, - 0 psig.**
l b)
The suction is automatically transferred from the condensate storage tank to the suppression chamber on a condensate i
storage tank water level - low signal and on a suppression chamber water level - high signal.
3.
Performing a CHANNEL CALIBRATION of the CSS, LPCI, and HPCI j
system discharge line " keep filled" alarm instrumentation.
i 4.
Performing a CHANNEL CALIBRATION of the CSS header AP instru-mentation and verifying the setpoint to be s the allowable value of 4.4 psid.
j 5.
Performing a CHANNEL CALIBRATION of the LPCI header AP instru-mentation and verifying the setpoint to be s the allowable value j
of 3.0 psid.
l d.
For the ADS:
1.
At least once per 31 days, performing a CHP:NEL FUNCTIONAL TEST of the accumulator backup compressed gas syst am low pressure alarm system.
2.
At least once per 24 months:
i a)
Performing a system functional test which includes simulated i
automatic actuation of the system throughout its emergency 4
operating sequence, but excluding actual valve actuation.
1 i
b)
Verify that when tested pursuant to Specification 4.0.5 that I
each ADS valve is capable of being opened.
t c)
Performing a CHANNEL CALIBRATION of the accumulator backup compressed gas system low pressure alarm system and verifying i
an alarm setpoint of 90 i 2 psig on decreasing pressure.
l t
- The provisions of SpeciH cation 4.0.4 are not applicable provided the i
surveillance is perform._4 vithin 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure is adequate to perform the test. If HPCI OPERABILITY is not successfully i
demonstrated within the 12-hour period, reduce reactor steam dome pressure i
to less than 200 psig within the following 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, i
}
)
i l
LIMERICK - UNIT 1 3/4 5-5 Amendment No. 291-33r-74 l
120 i
utruqk UNITED STATES g
g j
NUCLEAR REOULATORY COMMISSION
~
t WASHINGTON, D.C. 2006tM1001 5...../
I PHILADELPHIA ELECTRIC COMPANY DOCKET NO. 50-353 LIMERICK GENERATING STATION UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE i
Amendment No. 84 License No. NPF-85 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The at:11 cation for amendment by Philadelphia Electric Company (the licensee) dated March 29, 1996, as supplemented by letters dated i
December 5, 1996, and January 15, 1997, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by 3
this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
d a
t,
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-85 is hereby amended to read as follows:
Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 84
, are hereby incorporated in the license.
Philadelphia Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance and shall i
be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION h
. Stolz, irect I
ject Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
January 29, 1997
I ATTACHMENT TO LICENSE AMENDMENT NO. 84 FACILITY OPERATING LICENSE NO. NPF-85 DOCKET NO. 50-353 Replace the following page of the Appendix A Technical Specifications with the attached page. The revised page is identified by Amendment number and contains vertical lines indicating the area of change.
Remove Insert 3/4 5-5 3/4 5-5 i
A i
4 a
a 4
4 4
EMERGENCY CORE COOLING SYSTEMS
. =
1 SURVEILLANCE RE0VIREMENTS (Continued) 2.
For the HPCI system, verifying that:
i a)
The system develops a flow of at least 5600 gpm against a test line pressure corresponding to a reactor vessel pressure of 2 200 psig plus head and line losses, when steam is being supplied to the turbine at 200 + 15, - O psig.**
b)
The suction is automatically transferred from the condensate storage tank to the suppression chamber on a condensate l
storage tank water level - low signal and on a suppression l
chamber water level - high signal.
l 3.
Performing a CHANNEL CALIBRATION of the CSS, LPCI, and HPCI system discharge line " keep filled" alarm instrumentation.
i 4.
Performing a CHANNEL CALIBRATION of the CSS header AP instru-i mentation and verifying the setpoint to be s the allowable value of 4.4 psid.
5.
Performing a CHANNEL CALIBRATION of the LPCI header AP instru-mentation and verifying the setpoint to be s the allowable value of 3.0 psid.
d.
For the ADS:
1.
At least once per 31 days, performing a CHANNEL FUNCTIONAL TEST of the accumulator backup (ompressed gas system low pressure alarm system.
2.
At least once per 24 months:
a)
Performing a system functional test which includes simulated automatic actuation of the system throughout its emergency operating sequence, but excluding actual valve actuation.
b)
Verify that when tested pursuant to Specification 4.0.5 that each ADS valve is capable of being opened.
c)
Performing a CHANNEL CALIBRATION of the accumulator backup compressed gas system low pressure alarm system and verifying an alarm setpoint of 90 i 2 psig on decreasing pressure.
- The provisions of Specification 4.0.4 are not applicable provided the surveillance is performed within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure is adequate to perform the test. If HPCI OPERABILITY is not successfully demonstrated within the 12-hour period, reduce reactor steam dome pressure to less than 200 psig within the following 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
l l
LIMERICK - UNIT 2 3/4 5-5 Amendment No. 34, 84
,