ML20134C854
| ML20134C854 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 08/06/1985 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | Farrar D COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20134C855 | List: |
| References | |
| GL-83-28, NUDOCS 8508160453 | |
| Download: ML20134C854 (3) | |
Text
F 1
August 6, 1985 Docket Nos. 50-295 Distribution ' Docket file' and 50-304 ORB #1 RUG NRC PDR Gray file L POR HThompson OELD Mr. D. L. Farrar EJordan JPartlow Director of Nuclear Licensing BGrimes ACRS (10)
Conmonwealth Edison Company CParrish JNorris Post Office Box 767 ABournia RFroelich Chicago, Illinois 60690
Dear Mr. Farrar:
SUBJECT:
SALEM ATWS ITEM 1.2, POST TRIP REVIEW: DATA AND INFORMATION CAPABILITIES - ZION NUCLEAR POWER STATION, UNITS 1 AND 2 Enclosed, for your infonnation, is draft Technical Evaluation Report (TER) on Salem ATWS, Item 1.2.
It is sent to acquaint you with areas of staff's concerns. The TER represents staff's initial judgement, and we believe that open issues can be resolved by telephone, followed by subsequent documentation.
Please review the enclosed material and contact Jan Norris, the NRC Project Manager, to arrange a conference call (preferably during the week of August 12, 1985) with the appropriate NRC technical reviews.
Sincerely,
/s/SAVarga Steven A. Varga, Chief Operating Reactors Branch #1 Division of Licensing
Enclosure:
As stated cc w/ enclosure:
See next page 0Bf1D D
l L CP rri's J orfi /ts 8 (/8 08/ /5 08/
/85 I
0508160453 850806 PDR ADOCK 05000295 P
a e,
[
[0,i 8
UNITED STATES NUCLEAR REGULATORY COMMISSION O
cj WASHINGTON, D. C. 20555 -
August 6, 1985 Docket Nos. 50-295 and 50-304 Mr. D. L. Farrar Director of Nuclear Licensing Comonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690
Dear Mr. Farrar:
SUBJECT:
SALEM ATWS ITEM 1.2, POST TRIP REVIEW: DATA AND INFORMATION CAPABILITIES - ZION NUCLEAR POWER STATION, UNITS 1 AND 2 Enclosed, for your infonnation, is draft Technical Evaluation Report (TER) on Salem ATW3, Item 1.2.
It is sent to acquaint you with areas of staff's concerns. The TER represents staff's initial judgement, and we believe that open issues can be resolved by telephone, followed by subsequent documentation.
Please review the enclosed material and contact Jan Norris, the NRC Project Manager, to arrange a conference call (preferably during the week of August 12, 1985) with the appropriate NRC technical reviews.
Sincerely, O O I
da, hi.
eve Operating Reactors B 9 h #1 Division of Licensing
Enclosure:
As stated cc w/ enclosure:
See next page
Mr. D. L. Farrar Commonwealth Edison Company Zion Station cc:
Robert J. Vollen, Esquire The Honorable John E. Grotberg 109 North Dearborn Street United States House of Chicago, Illinois 60602 Representatives Washington, D.C. 20515 Dr. Cecil Lue-Hing Director of Research and Development Mr. Michael C. Parker, Chief Metropolitan Sanitary District Division of Engineering of Greater Chicago Illinois Department of Nuclear 100 East Erie Street Safety Chicago, Illinois 60611 1035 Outer Park Drive 5th Floor 4
Springfield, Illinois 62704 Mr. Phillip P. Steptoe Isham, Lincoln and Beale Counselors at Law Three First National Plaza 51st Floor Chicago, Illinois 60602 i
Susan N. Sekuler, Esquire Assistant Attorney General Environmental Control Division 188 West Randolph Street, Suite 2315 Chicago, Illinois 60601 Mayor of Zion Zion, Illinois 60099
..", Illinois Department of Nuclear Safety ATTN: Manager, Nuclear Facility Safety 1035 Outer Park Drive 5th Floor Springfield, Illinois 62704 a
U.S. Nuclear Regulatory Commission Resident Inspectors Office 105 Shiloh Blvd.
Zion, Illinois 60099 Pegional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 i
-