ML20134C250
| ML20134C250 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 08/12/1985 |
| From: | Axelson W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Cassidy T WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20134C252 | List: |
| References | |
| NUDOCS 8508160254 | |
| Download: ML20134C250 (2) | |
See also: IR 05000266/1985014
Text
- - _ - _ _ _ _
_ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ .
p V)B
.
.
,s. - m,.
-
- , _
pp- m nnsa
G u t.U UJ M Ll d O N U h D W6i N i
AUG 121985
,
Docket No. 50-266
Docket No. 50-301
Wisconsin Electric Power Company
A'1TN :
Mr. Thomas J. Cassidy
Executive Vice President
231 West Michigan Street
Milwaukee, WI 53201
Gentlemen:
This refers to the special physical security inspection conducted by
Mr. G. L. Pirtle of this office on July 12-17, 1985, of activities at the
Point Beach Nuclear Plant authorized by NRC Operating Licenses No. DPR-24
and No. DPR-27 and to the discussion of our findings with Mr. J. Zach and
other members of your staff at the conclusion of the onsite inspection.
The enclosed ccpy of our inspection report identifies areas, examined during
the inspection. Within these areas, the inspection consisted of a selective'
examination of procedures and-representative records, observations, and inter-
views with personnel.
.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements as ' described in the Paragraph 3.a. of the
report details. However, the violation meets the criteria in 10 CFR Part 2,
Appendix C,Section IV.A as a licensee identified violation. Consequently,
~
a Notice of Violation will not be issued and we have no further questions
regarding this matter at this time.
Paragraph 3.a. of the Report Details also identifies corrective actions to be
taken to resolve two concerns pertaining to the weapon safety / control program.
Please advise us in writing within 30 days after receipt of this report if '
our understanding of your actions is incorrect.
Areas e.<amined during this inspection concern a subject matter which is exempt
from disclosure according to Section 73.21(c)(2) of the NRC's " Rules of Prac-
tice," Part 73, Title 10, Code of Federal Regulations. This information must
be handled and protected in accordance with the provisions of 10 CFR 73.21.
Consequently, the enclosure to this letter and our report of this inspection
will not be placed in the Public Document Room.
,
pOk
Enclosure Contains
b
fAFEGUARDSINFORMATION
66
O
pon separation this
"'3e is Decontrolled
\\
1
pa-mia~mn
nimm e
-
1
G. u
w.VflitU d 66bi v a tLeif L 6 6 v ai
. .
.
. - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _
_
.g
-.
. - -
O S ~rof ! A r.00
strnnst
mrv
'
-
uss. u G Vi u \\ u v lIst va n ,u . g
)
l
t
,
Wisconsin Electric Power Company
2
AUG 1 2 1965
We will gladly discuss any questions you have concerning this inspection.
Since
ly,
.
c.
o
i
p.
u
-
-
r
W. L. Axelson, Chief
Nuclear Materials Safety and
.
Safeguards Branch
'
Enclosure:
Inspection Reports
'
'No. 50-266/85014(DRSS);
.
No. 50-301/85014(DRSS)
(UNCLASSIFIED SAFEGUARDS INFORMATION)
cc w/ enclosure:
,
J. J. Zach, Plant Manager
IE File
IE/DI/0RPB
IE/ES
.
NMSS/SGPL
NRR/DL/SSPB
t
cc w/ enclosure, w/o
UNCLASSIFIED SAFEGUARDS
INFORMATION:
1
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
-
John J. Duffy, Chief
Boiler Section
Ness Flores, Chairperson
Wisconsin Public Service
Commission
7
,
4
I
RIII
RII
RIII
gI
tie /rr
ed
c iw
Axelson
B/09/85
V
[
Enclosure contains
'
SAFEGUARDS INFORMATION
Upon separation this
n ---miarneittront"
-
page is Decontrolled
0 , m m m m e .. .. m . m . o o ~ ].
-