ML20134B060
| ML20134B060 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 10/30/1985 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20134B062 | List: |
| References | |
| NUDOCS 8511110218 | |
| Download: ML20134B060 (2) | |
See also: IR 05000327/1985032
Text
-
,
i
e
,O
.
'
OCT 3 01995
Tennessee Valley Authority
ATTN:
Mr. H. G. Parris
j
Manager of Power and
Engineering (Nuclear)
6N11 B Missionary Ridc.e Place
1101 Market Street
Chattanooga, TN 37402-2801
Gentlemen:
SUBJECT:
REPORT N05. 50-327/85-32 AND 50-328/85-32
On September 6 - October 5, 1985, NRC inspected activities authorized by NRC
Operating License Nos. OPR-77 and DPR-79 for your Sequoyah facilities.
At the
conclusion of the inspection, the findings were discussed with those members of
your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities violated NRC require-
ments.
The violations, references to pertinent requirements, and elements to be
included in your response are presented in the enclosed Notice of Violation.
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Of fice of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
DRIGINAL SIGNED BY
DAVID M. VERRELLI
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosures:
1.
2.
Inspection Report Nos. 327/85-32
and 328/85-32
cc w/encis:
(See page 2)
8511110210 051030
ADOCK 05000327
G
1 5
.IEoI
I
-
OCT 3 o gggg
-
Tennessee Valley Authority
2
cj w/encis:
Mi, L. Abercrombie, Sequoyah
d.NuclearPlantSiteDirector
R. Wallace, Plant Manager
J . W. Whitt, Chief, Nuclear
, Safety Staff
vD. L. Williams, Jr., Supervisor
Licensing Section
M.B. Kirk, Compliance
v6.StaffSupervisor
E. Wills, Project Engineer
bec w/encis:
dRCResidentInspector
Document Control Desk
State of Tennessee
RII
RII
RII (
63 d'
Qc0
KJenfson:lb
Algnatonis
SWeise
10/30/85
10/30/85
10/'he/85