ML20134A868
| ML20134A868 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 10/30/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20134A871 | List: |
| References | |
| NUDOCS 8511110080 | |
| Download: ML20134A868 (2) | |
See also: IR 05000414/1985043
Text
.k
gen-
October 30, 1985
j Duke Power Company
J ATTN:
Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Cha lotte, NC 28242
Gentlemen:
SUBJECT:
REPORT NO. 50-414/85-43
On September 30 - October 4, 1935, NRC inspected activities authorized by NRC
Construction Permit No. CPPR-117 for your Catawba Unit 2 facility.
At the
conclusion of the inspection, the findings were discussed with those members of
your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
,
Your attention is invited to unresolved items identified in the inspection
report. These matters will be pursued during future inspections.
Should you have ary questions concerning this letter, please contact us.
Sincerely,
(Original signed by VLBrownlee)
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
Inspection Report No. 50-414/85-43
gc w/ encl:
1. L. Dick, Vice President - Construction
A . W. Hampton, Station Manager
bec w/ enc 1:
(See page 2)
8511110000 051030
ADOCK 0 % h4
o
it
$2 O I
-
.y%,
.
.
Duke Power Company
2
October 30, 1985
bec w/ encl:
JG. Johnson, ELD
vK. N. Jabbour, NRR
Document Control Desk
State of South Carolina
NRC Resident Inspector
RII
RII
RII
RII
-
RNd,fght:cdg
{lb
f.J6
.
CAJul an
HDance
C
GABelisle
JBlake
/1'pf/85
10Q(/85
10/g /85
10/25/85
10/25/85
O