AUG 0 81985
Docket Nos. 50-317
50-318
Baltimore Gas and Electric Company
[
ATTN: Mr. A. E. Lundvall, Jr.
Vice President, Supply
P. O. Box 1475
Baltimore, Maryland 21203
.
Gentlemen:
Subject:
Combined Inspection Report Nos. 50-317/85-16 and 50-318/85-14
On June 24-28, 1985, an announced inspection was conducted by a team led
by Mr. John R. White of our office at the Calvert Cliffs Nuclear Power
Plant, Units 1 and 2, for the purpose of reviewing the licensee's
implementation of certain specifications of NUREG 0737, Clarification of
TMI Action Plan Requirements, relative to post-accident sampling and
monitoring.
Enclosure 1 provides the results of that inspection, which
were discussed with Mr. J. A. Tiernan and others of your staff at the
conclusion of the inspection.
Our review of this area indicates that your efforts to implement these
specifications, particularly with regard to post accident sampling were
less than adequate. Significant technical deficiencies were identified
in each area inspected, and several apparent violations with regulatory
requirements were noted. As a result, a management meeting with
representatives of your staff was held on July 11, 1985, at the NRC
' Region I office.
Enclosure 2 is a report of that meeting.
Of particular concern is that you appear to have failed to implement and
maintain a post-accident sampling capability in terms of either, (1) the
in-line analytical system that was described in submittals to the
Commission, and confirmed in the NRC " Order Confirming Licensee
Commitments on Post-TMI Related Issues," dated March 14,1983; or (2)
the preplanned alternate sampling method that is required by Technical
Specification 3/4.7.13, " Post Accident Sampling", when the in-line
analytical system is inoperative.
As a result of these findings an Enforcement Conference will be held
with your staff on August 14, 1985, at the NRC Region I Office to
discuss the implications of these findings, the status of corrective
measures completed or planned since this inspection, and determine what
enforcement action is warranted in this matter.
'
8508150400 850808
ADOCK 05000317
O
0FFICIAL RECORD COPY
.
f60/
'lo
a
O'
S
flotwithstanding the results of that meeting you are requested to respond
in writing relative to the technical deficiencies identified in this
report within 30 days of the date of this letter. Your response should
identify actions taken or planned to resolve the deficiencies noted.
Thank you for your cooperation.
Sincerely,
original signed By;
&dQ 00
Thomas T'.
Martin, Director
Division of Radiation Safety
and Safeguards
1
Enclosures:
1.
Combined NRC Region I Inspection Report Numbers
50-317/85-16 and 50-318/85-14
2.
Management Meeting Report Number 85-72
cc w/encls:
R. M. Douglass, Manager, Quality Assurance
L. B. Russell, Plant Superintendent
Thomas Magette, Administrator, Nuclear Evaluations
.
R. C. L. Olson, Principal Engineer
J. A. Tiernan, Manager, Nuclear Power
R. E. Denton, General Supervisor, Training and Technical Services
PublicDocumentRoom(PDR)
Local Public Document. Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Maryland (2)
.
bec w/encls:
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o encl)
DRP Section Chief
Jane Axelrad, D/ES
D. Holody, RI
-
_ . _ . . _
L
\\
0
Lh
RI-
S
RI:DkSS
/f 2 0##
R: RSS
{gcb
Sd
ky
o
Be
K44
Martin
'
9{llamyg(8lblW
S{V/f(
8/
85
(>
0FFICIAL RECORD COPY
CIR CALC 85-16/14 - 0001.2.0
RI
08/05/85
Shanbaky
8/ 7 /85
/d Oh
,
-
.