ML20134A349
| ML20134A349 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 10/30/1985 |
| From: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Opeka J NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20134A351 | List: |
| References | |
| NUDOCS 8511040364 | |
| Download: ML20134A349 (2) | |
See also: IR 05000423/1985054
Text
__
_
-
_
i
o
I
o
)
l
DCT 3 0 ;g35
Docket No. 50-423
Northeast Nuclear Energy Company
ATTN: Mr. J. F. Opeka
Senior Vice President - Nuclear
Engineering and Operations Group
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject: Inspection Report No. 50-423/85-54
This refers to the As-Built Team inspection conducted by Mr. J. T. Wiggins of
this office on September 9-20, 1985, at the Millstone Nuclear Power Station,
Unit 3, Waterford, Connecticut, of activities authorized by NRC License No.
CPPR-113 and to the discussions of our findings held by Mr. J. Wiggins with
Messrs. J. Crockett, L. Nadeau, and V. Papadopoli at the conclusion of the
inspection.
Areas examined during this inspection are described in the NRC Region !
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, measurements and calculations made by the
inspectors, and observations by the inspectors.
Within the scope of this inspection, no violations were observed.
In fact,
the-inspection demonstrated that the systems examined were constructed
substantially in accordance with the descriptions provided in the Final Safety
Analysis Report.
Independent calculations performed by the NRC staff indicate that the air
storage bottle capacity, required for control room pressurization and habit-
ability, is marginal and may not be able to adequately compensate for the
assumed control room leak rate specified in Section 6.4 of NUREG-1031, Safety
Evaluation Report (SER) for Millstone 3.
You should address this concern and
assure that the system design envelope is consistent with the SER and plant
Technical Specifications.
BBA218Bei8868lha
G
OFFICIAL RECORD COPY
CAT MILL 3 85-54 - 0001.0.0
10/29/85
\\
0
f
\\/
_ _ _ _ _ - _ _ _ _
__.
.
.
Northeast Nuclear Energy Company
2
No reply to this letter is required.
Your cooperation witt us in this matter
i
is appreciated.
Sincerely,
ht14)
Y
Stewart D. Ebneter, Chief,
Division of Reactor Safety
' Enclosure: NRC Region I Inspection Report No. 50-423/85-54
cc w/ enc 1:
V. Papadopoli, Construction Quality Assurance Supervisor
E. R. Foster, Director of Generation Construction
E. J. Mroczka, Vice President, Nuclear Operations
D. O. Nordquist, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
W. D. Romberg, Station Superintendent
Public Document Room (POR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Senior Resident Inspector
State of Connecticut
bec w/ enc 1:
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o enc 1)
ORP Section Chief
G. Walton, SRI, BV-2
T. Shediosky, SRI, Millstone 1&2
B. Doolittle, LPM, NRR
h
RI:0RS
RI:DRS
RI:DRS
Wiggins/geb
Durr
Etpleter
10/p/85
N/,f /s'
lU 7;u'
N
OFFICIAL RECORD COPY
CAT MILL 3 85-54 - 0001.1.0
10/16/85
55df
-
- - -