ML20133Q112

From kanterella
Jump to navigation Jump to search
Advises That Util 831104 Response to Generic Ltr 83-28 Does Not Meet Guidelines for post-trip Review.Requests Action to Correct Deficiencies & Addl Info within 30 Days of Ltr Receipt.Ser Encl
ML20133Q112
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/24/1985
From: Stolz J
Office of Nuclear Reactor Regulation
To: Wilgus W
FLORIDA POWER CORP.
Shared Package
ML20133Q113 List:
References
GL-83-28, NUDOCS 8511010393
Download: ML20133Q112 (3)


Text

-

Octobee 24, 1985 Docket No. 50-302 DISTRIBUTION 4 Docket File >

RIngram '

NRC PDR HSilver L PDR Gray File Mr. Walter S. Wilgus ORB #4 Rdg EBrach Vice President, Nuclear Operations HThompson 40rnstein Florida Power Corporation 0 ELD WPaulson ATTN: Manager, Nuclear Licensing EJordan GEdison ,

& Fuel Management BGrimes ABournia P. O. Box 14042; M.A.C. 4-3 JPartlow St. Petersburg, Florida 33733 ACRS-10

Dear Mr. Wilgus:

SUBJECT:

GENERIC LETTER 83-28, ITEM'1.1 (POST TRIP REVIEW): SAFETY EVALUATION AND REQUEST FOR ADDITIONAL INFORMATION Re: Crystal River Nuclear Plant, Unit 3 By letter dated November 4, 1983, Florida Power Corporation responded to Generic Letter 83-28 with regard to required actions based on generic implications of Salem ATWS events. The enclosed Safety Evaluation (SE) was prepared by the NRC staff based upon input from our contractor, Science Applications International Corporation (SAI), after having reviewed the portions of your response to Generic Letter 83-28 dealing with your post-trip review program and procedures for Crystal River Unit 3.

We find that your response does not meet the guidelines developed for post-trip review in the following areas:

(1). The criteria for the need of independent assessment of the event following a trip.

(2). Incorporation of these criteria into the procedure for conducting restart evaluations.

We request that you *.ake nacessary action to correct the deficiencies noted above, which are discussed in reater detail in Section III of the SE and provide additional information witnin 30 days of receipt of this letter.

Acceptable responses to the above noted deficiencies are required before we 8511010393 851024 PDR l

P ADOCK 05000307 PDR l

[. .

Mr. W. S. Wilgus Crystal River Unit No. 3 Nuclear Florida Powcr Corporation Generating Plant cc: -

i Mr. R. W. Neiser Bureau of Intergovernmental Relations i Senior Vice President 660 Apalachee Parkway  ;

and General Counsel Tallahassee, Florida 32304 '

Florida Power Corporation P. O. Box 14042 Mr. Wilbur Langely, Chairman St Petersburg, Florida 33733 Board of County Commissioners Citrus County Nuclear Plant Manager Inverness, Florida 36250 Florida Power Corporation .

P. O. Box 219 Crystal River, Florida 32629 Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division Suite 220, 7910 Woodmont Avenue Bethesda, Maryland 20814 Resident Inspector ,

U.S. Nuclear Regulatory Commission 6 Route 13, Box 717 Crystal River, Florida 32629 Regional Administr 'or, Revion II U.S. Nuclear Regu > ary Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Mr. Ulray Clark, Administrator

~

Radiological Health Services .

Department of Health and Rehabilitative Services 1323 Winewood Blvd.

Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301

Attorney General ,

Department of Legal Affairs The Capitol Tallahassee, Florida 32304

-- _ _ - - - - , - y y .,- -,, - --y-._ -- ,vy, , - - . - _ - . - - - --,_m.-. - , _ _ . - . . _.__,.-__,,,_-y--.,-.__.,--w- - - . - , ,,--

Mr. Wilgus can complete our review of the Post Trip Review Program and Procedure for Crystal River. We will review these responses when received and report our findings in a supplement to this SE.

Sincerely,

=c.nce s c;c = or 2 % si 1. S M

  • John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing

Enclosure:

Safety Evaluation cc w/ enclosure:

See next page l

JV

  • ' HSilver;cr h :DL J

!4:0L l 10g85 10gy

. . . _ . -. . . - . . - - . . . -