ML20133Q102

From kanterella
Jump to navigation Jump to search
Discusses 850828 Meeting at Region II Ofc Re Proposed 10CFR50.54(p) Change to Physical Security Plan.Meeting Beneficial & Provided Better Understanding of Forthcoming Plan Changes.Meeting Summary & Attendance List Encl
ML20133Q102
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 09/12/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8511010387
Download: ML20133Q102 (3)


Text

f -

3 .

bt.P 121985 Carolina Power and' Light Company

/ ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC. 27602 Gentlemen:

SUBJECT:

MEETING

SUMMARY

DOCKET NO. 50-261

This refers to the meeting conducted at your request, in the Region II Office on August 28, 1985. This meeting was held to discuss a proposed 10 CFR 50.54(p)

=

change to the H. B. Robinson Physical Security Plan.

It was our opinion that this meeting was beneficial and has provided a better understanding of the forthcoming plan changes.

In accordance with Section 2.790 of NRC's " Rules of Practice," Title 10, Code of-Federal _ Regulations, a copy of this letter will be placed in the NRC's Public Document Room.

Should you - have any questions concerning this matter, we will be pleased to discuss them.

Sincerely, Roger D. Walker, Director Division of Reactor Projects

Enclosures:

1. Meeting-Summary
2. Attendance List Cc l G. w/P.encl:

Beatty,-Jr., Manager Robinson Nuclear Project Department

. E. Morgan, Plant General Manager fccw/ encl: Inspector NRC Resident Document Control Desk State of North Carolina RII RII -

RII RII RII q

Myc p RII' 9)ku CPehy:dr uire Kbc N JP tohr PFredr ekson 0ferreli 9/ 9 /85 9/g/85 9/T/85 9/10/85 9/{[/85 9/ft) /85 8511010387 850912 PDR ADOCK 05000261 F PDR II ZE45 El

ENCLOSURE 1 MEETING

SUMMARY

Licensee: Carolina Power and Light Company Facility: H. B. Robinson License No.: DPR-23

Subject:

PROPOSED REVISION TO THE PHYSICAL SECURITY PLAN On August 29, 1985, members of the Region II staff and representatives of Carolina Power and Light Company (CP&L) met to discuss proposed changes to the H. B. Robinson Physical Security Plan (PSP). The changes involve integration of a major security upgrade modification with the existing electronic intrusion detection / access control system. The licensee has developed Chapter 9 of the PSP which desribes the modifications and the phased integration of the systems. The licensee's proposal was discussed and no major conflicts were identified.

Editorial clarification was suggested to enhance the clarity and inspectability of the proposed changes during system change over. Another change was discussed which involved the reconfiguration of a vital area barrier. The change does not involve the redesignation of any vital equipment.

m,

7. .. . , o:

ENCLOSURE 2 ATTENDANCE LIST Carolina Power'and-Light Company L. Williams, Security Supervisor D. Quick, Project Manager, Security System Upgrade U.S. Nuclear. Regulatory Commission D. McGuire, Chief, Physical Security Section

0. Masnyk, Security Inspector C. Perny, Security. Inspector

-