ML20133P989
| ML20133P989 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 10/17/1985 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20133P991 | List: |
| References | |
| NUDOCS 8511010293 | |
| Download: ML20133P989 (2) | |
See also: IR 05000324/1985031
Text
7
pfytd!
< * ; .o
.
.
OCT 171985
/ Carolina Power and Light Company
ATTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. O. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
REPORT NOS. 50-325/85-31 AND 50-324/85-31
On September 9-13 and September 23-26, 1985, NRC inspected activities authorized
by NRC Operating License Nos. DPR-71 and DPR-62 for your Brunswick facility. At
the conclusion of the inspection, the findings were discussed with those members
of your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews ,vith personnel, and observation of activities
in progress.
-
Within the scope,of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
b
David M. Verre111, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
Inspection Report Nos. 50-325/85-31
and 50-324/85-31
pc w/ encl:
VP. W. Howe, Vice President
Brunswick Nuclear Project
/C. R. Dietz, Plant General Manager
bec w/ enc 1:
(See page 2)
0511010293 051017
PDFt
ADOCK 05000324
G
VDR
I
(
.
.
E# #I
r
,
.
..
.
.
Carolina Power and Light Company
2
OCT 171985
fccw/ encl:
NRC Resident Inspector
Document Control Desk
State of North Carolina
RII
RI!
(G%
)
-
d/jj/85
/// /85
j
10/
85
i
L
---
- - - - - -
--
-- -
- ---- - - - - ------- - --------