Forwards Summary of 850716 Meeting W/Util in Region II Re Proposed 10CFR50.54(p) Change to Physical Security Plan. Meeting Resulted in Proposal to Also Modify Existing Guardhouse & Protected Area Barrier Interface
ML20133P349
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/01/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Wilgus W
FLORIDA POWER CORP.
References
NUDOCS 8508140269
Download: ML20133P349 (3)


Text

~

AUG 011985 Florida Power Corporation ATTN:

Mr. W. S. Wilgus Vice President Nuclear Operations jP.O. Box 14042,M.A.C.H-2 St. Petersburg, FL 33733 Gentlemen:

SUBJECT:

MEETING

SUMMARY

DOCKET NO. 50-302 This refers to the meeting conducted at your request, in the Region II Cffice on July 16, 1985.

This meeting was held to discuss a proposed 10 CFR 50.54(p) change to the Crystal River Physical Security Plan.

It was our opinion that this meeting was beneficial and has provided a better understanding of the forthcoming plan changes.

In accordance with Section 2.790 of NRC's " Rules of Practice," Title 10, Code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Room.

Should you have any questions concerning this matter, we will be please to discuss them.

Sincerely, Roger D. Walker, Director Division of Reactor Projects

Enclosures:

1.

Meeting Summary 2.

Attendance List Ac w/encls:

/ E. M. Howard, Director d.SiteNuclearOperations F. McKee, Nuclear Plant Manager g R. Westafer, Manager Nuclear Operations Licensing and Fuel Management bcc w/encls:

QGC Resident Inspector Document Control Desk 81gy %

State of Florida RII Rf I

RI

$[RII RI RII

&f

./C Carroll VPahciera VBrknlee CPer$/85 ny:Jw uTre arr JS ohr 7/)

7/gf85 7

/85 7/31/85 7/D/85 jf////85

%/ I /85 t

\\s LEdi J

ENCLOSURE 1 MEETING

SUMMARY

Licensee: Florida Power Corporation Facility: Crystal River License No..

DPR-72

SUBJECT:

PROPOSED REVISION TO THE PHYSICAL SECURITY PLAN On July 16, 1985, members of the NRC Region 11 staff and representatives of Florida Power Corporation (FPC) met to discuss proposed changes to the Crystal River Physical Security Plan.

The majority of the changes involved the licensee's decision to retain the new administration building outside the protected area and incorporate the construction modifications to the protected area barrier as permanent modifications. This resulted in a proposal to also modify the existing guardhouse and protected area barrier interface.

Other changes were generally editorial.

Discussion of the changes found that some minor clarification of wording was needed to ensure that the licensee's intent and the inspectability of the changes were clear. Two of the proposed changes will require further discussion between the Regional staff and headquarters. These involve the changes to the status of the secondary alarm station and the guardhouse protected area barrier interface, l

1 i

ENCLOSURE 2 ATTENDANCE LIST l

Florida Power Corporation S. Powell, Senior Nuclear Licensing Engineer J. Buckner, Nuclear Security Superintendent R. Schmiedel, Nuclear Electrical Engineer U.S. Nuclear Regulatory Commission D. McGuire, Chief, Physical Security Section V. Panciera, Chief, Reactor Projects Section 2-8 C. Perny, Security Inspector J. Ennis, Security Inspector

0. Masnyk, Security Inspector l