ML20133P324

From kanterella
Jump to navigation Jump to search
Forwards Exam Rept 50-261/OL-85-01 of Exam Administered on 850618-20.Exam Question & Answer Key Withheld (Ref 10CFR2.790)
ML20133P324
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 07/23/1985
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20133P327 List:
References
NUDOCS 8508140261
Download: ML20133P324 (2)


Text

- --. . - .. . - - . - . - -. . - . - _ _ _ _ .

. L(ellad f

3*

July 23, 1985 Carolina Powar and Light Company l ATTN: Mr. E. E. Utley i

Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 i

Gentlemen:

SUBJECT:

H. B. ROBINSON EXAMINATION REPORT 261/0L-85-01 The NRC administered examinations on June 18 - 20, 1985, to employees of your company who had applied for licenses to operate the H. B. Robinson Nuclear Plant.

At the conclusion of the examinations, the examination questions and preliminary findings were discussed with those members of your staff identified in the Examination Report, Enclosure 1.

! A table summarizing the examination results for each examined individual is

]

provided as Enclosure 2.

Copies of the written examination questions and answer key are included in this i report as Enclosure 3.

In accordance with 10 CFR 2.790(a), a copy of this letter and Enclosures 1 and 3 will be placed in NRC's Public Document Room. Enclosure 2 is exempt from public disclosure pursuant to 10 CFR 2.790(a) and will not be sent to the Public Document Room.

i Should you have any questions concerning this letter, please contact us.

! Sincerely, 4

(Original signed by DMVerrelli)

, David M. Verrelli, Chief Reactor Projects Branch 1 Division of Reactor Projects  ;

1

)

i

Enclosures:

l 1. Examination Report 50-261/0L-85-01

2. Table of Examination Results (Official Use Only-Privacy Act l Information) l 3. R0/SRO Exam Questions and Answer Key cc w/encls: (See page 2) 61 8508140261 PDR ADOCK P h [DR i

ZEQ i

't Carolina Power and Light Company 2 July 23, 1985

. cc w/encls. 1 & 2:

R. E. Morgan, Plant General Manager cc w/encls. 1, 2, & 3:

C. Bethea, Site Training Supervisor bec w/encls. 1, 2, & 3: l

. Senior Resident Inspector bec w/ encl. 1:

Project Manager, NRR State of South Carolina A. J. Vinnola, EG&G bec w/encls. 1 & 3:

Operator Licensing Branch, DHFS,NRR Document Control Desk J

1 l

f 4

A RII RII RII RI RII - j

! LOOSb WGDouglas:lb

&swilson C CRJ 'an . PF d ickson W

DMVerrelli

7/lp/85 741 /85 7// /85 7/pj/85 7/25/85 w -- e- a . , - -, or-, - . - - - - . , ,,n . -- - - - . ,,- --m-. n-