1 JUL 2 41985 Florida P
'r Corporation ATTN:
W. S. Wilgus Vice President Nuclear Operations P. O. Box 14042, M.A.C. H-2 St. Petersburg, FL 33733 Gentlemen:
SUBJECT:
MEETING
SUMMARY
- CRYSTAL RIVER UNIT 3 - DOCKET N0. 50-302 This letter refers to the meeting conducted at your staff's request in the NRC Region II Office on July 16, 1985. This meeting was related to the application of Fire Protection, 10 CFR 50, Appendix R, and the forthcoming Appendix R inspec-tion at Crystal River. Enclosed is a summary of the meeting topics.
It is our opinion that this meeting was beneficial, and provided for a better understanding of NRC's Appendix R Fire Protection inspection methodology and Florida Power Corporation's Appendix R analysis and design approach.
Should you have any questions concerning this matter, we will be pleased to discuss them.
Sincerely, llD' [. h(6tunhC h --
Roger D. Walker, Director Division of Reactor Projects
Enclosure:
Meeting Summary w/ attachment
- ccw/ encl:
. M. Howard, Director JiteNuclearOperations V.J. McKee, Nuclear Plant Manager V. R. Westafer, Manager Nuclear Operations Licensing and Fuel Management jjj8240157 8507h3 bec w/ enc 1:
4 G
ADWK 0500 esident Inspector 02 ocument Control Desk PDR State of Florida O[
T. E. Conlon, RII Q
V. Panciera, RII W. Miller, RII G. Wiseman, RII RII RII RI RI RII WMFts TEconlon ARHerdt AGibson Brow lee 07/ { /85 07/p/85 07/g%/85 07/gj/85 07/7/85
6 ENCLOSURE MEETING
SUMMARY
Licensee:
Florida Power Corporation Facility: Crystal River Unit 3 Docket No.: 50-302 Facility License No.: DPR-72 A meeting was held in the NRC Region II office on July 16, 1985, to discuss the implementation of 10 CFR 50, Appendix R, Fire Protection, in preparation for the special inspection at Crystal River scheduled for July 29, through August 2, 1985.
The following items were discussed in detail:
inspection schedule and scope, electrical associated circuit analysis, electrical modifications; fire protection features; plant shutdown procedures; emergency lighting; and oil collection system for the reactor coolant pump.
Attachment:
Attendance list d
l
{
y
.5 ATTACHMENT ATTENDANCE LIST Attendance at the FPC - NRC meeting on July 16, 1985, at the NRC Region II office.
Florida Power Corporation S. Powell, Senior Nuclear Licensing Engineer R. P. Schmiedel, Nuclear Electrical Engineer M. Kirk, Nuclear Operations Technical Advisor J. L. Russell, Senior Fire Protection Specialist NRC Region II V. Panciera, Chief, Projects Section 2B A. B. Ruff, Electrical Engineer, Plant Systems Section M. D. Hunt, Electrical Engineer, Plant Systems Section G. R. Wiseman, Fire Protect'on Engineer, Plant Systems Section W. H. Miller, Jr., Fire Protection Engineer, Plant Systems Section T. F. McElhinney, Reactor Engineer, Plant SystemsSection I
l
..