Responds to Concern Re Adequacy of Preoperational Test to Measure Flow Velocity Distribution of Auxiliary Bldg Filtered Ventilation Sys.Engineering Evaluation Concluded That Ventilation Sys Operable
Date released: 05/26/2020 Download: ML20133N885


Procedure MCC-1211.00-00-0096, Auxiliary Bldg Ventilation Sys Acceptance Criteria for Supplemental Filter Testing.
ML20133N897
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 10/23/1985
From: Richardson J, Smith H, Weidler R
DUKE POWER CO.
To:
References
Download: ML20133N897 (16)
Procedure TT/1/A/9100/101B, Auxiliary Bldg Ventilation Sys Air Flow Distribution Measurements Ii.
ML20133N894
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 10/23/1985
From: Johansen R, Roberson P
DUKE POWER CO.
To:
References
Download: ML20133N894 (8)
Procedure TT/1/A/9100/101A, Auxiliary Bldg Ventilation Sys Air Flow Distribution Measurements I.
ML20133N892
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 10/23/1985
From: Johansen R, Roberson P
DUKE POWER CO.
To:
References
Download: ML20133N892 (7)
Confirmation of Action Ltr Re Control Room & Auxiliary Bldg Ventilation Sys Filter Testing.Actions to Be Taken Listed
ML20133N886
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 10/23/1985
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: TUCKER H B
DUKE POWER CO.
References
Download: ML20133N886 (1)
Responds to Concern Re Adequacy of Preoperational Test to Measure Flow Velocity Distribution of Auxiliary Bldg Filtered Ventilation Sys.Engineering Evaluation Concluded That Ventilation Sys Operable
ML20133N881
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 10/28/1985
From: Tucker H
DUKE POWER CO.
To: ADENSAM E G, DENTON H R
Office of Nuclear Reactor Regulation
References
Download: ML20133N881 (2)