Commonwealth Edison -
c One First Nationii Plaza. Chicago, lihnots O "J Address Reply to: Post Office Box 767
-' G Chicago, Illinois 60690 October 21, 1985
.Mr. James G. Keppler Regional Administrator
-U.S.
Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL. 60137
Subject:
Braidwood Station Units 1 and 2 10 CFR 50.55(e) No. 85-06 Interim Report Failure of Diesel Generators to Sustain Adequate Prime NRC Docket Nos. 50-456/457
Reference:
August 22, 1985 A.D. Miosi Letter to J.G. Keppler
Dear Mr. Keppler:
On July 23, 1985, Commonwealth Edison Company notified your office of'a potential deficiency reportable pursuant to 10 CFR 50.55(e) regarding 1A and 1B diesel generator's failure to sustain adequate prime during testing at our Braidwood Station.
This letter provides additional information concerning this matter and serves as an interim report.
Representatives from S&L, Cooper Energy Services, and CECO.
have agreed upon a modification to tho diesel engine fuel system.
Revised drawings from Cooper Energy Services will be sent to provide the details of this modification.
Once the modification is completed, testing will be conducted to verify that adequate fuel oil. system prime is maintained.
A final report will be sent when the testing is completed.
1 Very truly yours, f
4 8510300107 851021 PDR ADOCK OS000456 O./f/Lezu S
PM A. 0..Miosi Nuclear Licensing Administrator