Forwards Safety Insp Repts 50-317/85-18 & 50-318/85-16 on 850715-19.Aggressive Actions Not Being Implemented to Correct Deficiencies Identified During 850624-28 Insp.Action Will Be Discussed at 850814 Enforcement Conference
ML20133N567
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/07/1985
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20133N570 List:
References
NUDOCS 8508130531
Download: ML20133N567 (2)


See also: IR 05000317/1985018

Text

..' l,

AUG 0 71985

Docket / License: 50-317/0PR-53

50-318/DPR-69

Baltimore Gas and Electric Company

ATIN: Mr. A. E. Lundvall, Jr.

Vice President, Supply

P. O. Box 1475

Baltimore, Maryland 21203

Gentlemen: ,

Subject: Combined Inspection Nos. 50-317/85-18, 50-318/85-16

This refers to the special safety inspection conducted by Mr. T. Elsasser of this

office on July 15-19, 1985 at Calvert Cliffs Nuclear Power Plant, Units 1 and 2,

Lusby, Maryland and to the discussions of our findings held with Mr. J. Tiernan

and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection included: the operability status of the Post

Accident Sampling System (PASS); the adequacy of alternate means of post accident

sampling; PASS procurement, installation, and acceptance testing; installation and

acceptance of other selected TMI Action Plan hardware modifications; and management

and committee oversight of PASS. These areas are described in the Inspection Re-

port which is enclosed with this letter.

We are concerned that aggressive action was not being implemented at the time of

this inspection to correct the deficiencies identified during our previous inspec-

tion of PASS on June 24-28, 1985 (50-317/85-16, 50-318/85-14). The action plan

submitted by Mr. Tiernan at the exit meeting appears to correct that situation and

willebe closely followed during future NRC inspections.

Potential enforcement action associated with PASS deficiencies will be discussed

with you during an Enforcement Conference at the Region I Office on August 14, 1985.

The details of this conference will be communicated to you in separate correspon-

dence associated with Inspection Report 50-317/85-16, 50-318/85-14.

No reply to this letter is required. Your cooperation with us in this matter is

appreciated.

Sincerely, prigwal signed By:

~

6

Edward C. Wenzinger, Chief

Projects Branch No. 3

Division of Reactor Projects

Enclosure: NRC Region I Report 50-317/85-18, 50-318/85-16

8500130531 850007

PDR ADOCK 05000317

G PDR /

.

., o

Baltimore Gas and Electric Company 2 AUG 0 71965

cc ./encls:

R. M. Douglass, Manager, Quality Assurance

L. B. Russell, Plant Superintendent

T. Magette.-Administrator, Nuclear Evaluations

R. C. L. Olson, Principal Engineer, Nuclear Licensing & Analysis Unit

J. A. Tiernan, Manager, Nuclear Power Department

R. E. Denton, General Supervisor, Training and Technical Services

Public Document Room (PDR)

Local Public Document Room (LPDR)

-Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Maryland (2)

bec w/encis:

Region I Docket Room (with concurrences)

Director, DRS

Director, DRSS

DRP Section Chief

f RI: RI RI:DPR

Foley Trimble/fi s r

e

Wenzi n,

gers.-

[ 8/6/85 Elp'gp

g.

'

,H

0FFICIAL RECORD COPY