Text
..' l,
AUG 0 71985
Docket / License: 50-317/0PR-53
50-318/DPR-69
Baltimore Gas and Electric Company
ATIN:
Mr. A. E. Lundvall, Jr.
Vice President, Supply
P. O. Box 1475
Baltimore, Maryland 21203
Gentlemen:
,
Subject:
Combined Inspection Nos. 50-317/85-18, 50-318/85-16
This refers to the special safety inspection conducted by Mr. T. Elsasser of this
office on July 15-19, 1985 at Calvert Cliffs Nuclear Power Plant, Units 1 and 2,
Lusby, Maryland and to the discussions of our findings held with Mr. J. Tiernan
and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection included:
the operability status of the Post
Accident Sampling System (PASS); the adequacy of alternate means of post accident
sampling; PASS procurement, installation, and acceptance testing; installation and
acceptance of other selected TMI Action Plan hardware modifications; and management
and committee oversight of PASS.
These areas are described in the Inspection Re-
port which is enclosed with this letter.
We are concerned that aggressive action was not being implemented at the time of
this inspection to correct the deficiencies identified during our previous inspec-
tion of PASS on June 24-28, 1985 (50-317/85-16, 50-318/85-14).
The action plan
submitted by Mr. Tiernan at the exit meeting appears to correct that situation and
willebe closely followed during future NRC inspections.
Potential enforcement action associated with PASS deficiencies will be discussed
with you during an Enforcement Conference at the Region I Office on August 14, 1985.
The details of this conference will be communicated to you in separate correspon-
dence associated with Inspection Report 50-317/85-16, 50-318/85-14.
No reply to this letter is required.
Your cooperation with us in this matter is
appreciated.
Sincerely, prigwal signed By:
6
~ Edward C. Wenzinger, Chief
Projects Branch No. 3
Division of Reactor Projects
Enclosure:
NRC Region I Report 50-317/85-18, 50-318/85-16
8500130531 850007
ADOCK 05000317
G
/
.
o
.,
AUG 0 71965
Baltimore Gas and Electric Company
2
cc ./encls:
R. M. Douglass, Manager, Quality Assurance
L. B. Russell, Plant Superintendent
T. Magette.-Administrator, Nuclear Evaluations
R. C. L. Olson, Principal Engineer, Nuclear Licensing & Analysis Unit
J. A. Tiernan, Manager, Nuclear Power Department
R. E. Denton, General Supervisor, Training and Technical Services
Public Document Room (PDR)
Local Public Document Room (LPDR)
-Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Maryland (2)
bec w/encis:
Region I Docket Room (with concurrences)
Director, DRS
Director, DRSS
DRP Section Chief
f RI:
RI
RI:DPR
e
Wenzi n, s.-
Foley Trimble/fi
Elp'gp
s r
ger
[
8/6/85
g.
,H
'
0FFICIAL RECORD COPY