ML20133N426

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-413/85-31 & 50-414/85-25 on 850626-0726.No Violation Noted
ML20133N426
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/06/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20133N430 List:
References
NUDOCS 8508130485
Download: ML20133N426 (1)


See also: IR 05000413/1985031

Text

_ _ _ _ _ _ _ __

AUG 0 61985

Duke Power Company

/ ATTN: Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT: REPORT NOS. 50-413/85-31 AND 50-414/85-25

On June 26 - July 26, 1985, NRC inspected activities authorized by NRC License

No. NPF-35 and NRC Construction Permit No. CPPR-117 for your Catawba facility.

At the conclusion of the inspection, the findings were discussed with those

members of your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Your attention is invited to unresolved items identified in the inspection

report. These matters will be pursued during future inspections.

Should you have any questions concerning this letter, please contact us.

Sincerely.

ORIGINAL SIGNED BY

VIRGIL L. BROWNLEE

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50-413/85-31

and 50-414/85-25

cc w/ enc 1:

vR. L. Dick, Vice President - Construction

/J. W. Hampton, Station Manager

bec w/ enc 1:

vG. Johnson, ELD

vK. N. Jabbour, NRR

Document Control Desk

State of South Carolina

vb Resident Inspecto 81

O

CBu[Y er:sa HCD nce

07/ 85 07Jr/85

%  % >

i

')I yeoi