Forwards Safety Insp Rept 50-341/85-41 on 851001-03.No Violation Noted.Exercise Weakness Identified Re Protective Action Decisionmaking
ML20133N009
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/22/1985
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jens W
DETROIT EDISON CO.
Shared Package
ML20133N010 List:
References
NUDOCS 8510280352
Download: ML20133N009 (3)


See also: IR 05000341/1985041

Text

t

.

OCT 2 2 1985

Docket No. 50-341

The Detroit Edison Company

ATTN:

Wayne H. Jens

Vice President

Nuclear Operations

6400 North Dixie Highway

Newport, MI 48166

Gentlemen:

This refers to the routine safety inspection conducted by Mr. W. Snell and

others of this office on October 1-3, 1985, of activities at the Enrico Fermi

Atomic Power Plant, Unit 2 authorized by NRC Operating License No. NPF-33 and

to the discussion of our findings with you and others of your staff at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

However, a weakness was identified which will need corrective

action by your staff.

This weakness is summarized in the attached Appendix

to this letter.

As required by 10 CFR Part 50, Appendix E, IV.F, any

weaknesses that are 'dentified must be corrected.

Accordingly, you are

requested to submit

written statement within 45 days of the date of this

letter describing your planned actions for correcting the weakness identified

in the Appendix.

The response directed by this letter is not subject to the clearance procedures

of the Office of Management and Budget as required by the Paperwork Reduction

Act of 1980, PL 96-511.

f

G

>nWW

m a g eM 05000343

esima

G

3

PDR

S

.

--

-.

.

,

.

The Detroit Edison Company

2

007 2 2 1985

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

G

'$j

in

W. D. Shafer, Chief

Emergency Preparedness and

Radiological Protection Branch

Enclosures:

1.

Appendix, Exercise

Weakness

2.

Inspection Report

No. 50-341/85041(DRSS)

cc w/ enclosures:

L. P. Bregni, Licensing

Engineer

P. A. Marquardt, Corporate

Legal Department

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Commission

Harry H. Voigt, Esq.

Nuclear Facilities and

Environmental Monitoring

Section

Monroe County Office of

Civil Preparedness

W. Weaver, FEMA, Region V

D. Matthews, EPB, 0IE

..

b

a e

/

ht

r

10/18/85

p

.

I

I

Appendix

!

EXERCISE WEAKNESS

,

l

Licensee personnel failed to incorporate current and forecast meteorology

(primarily wind direction) into the protective action decisionmaking

i

process which resulted in conveying marginally acceptable protective

action recommendations to the State of Michigan.

Open Item No. 341/85041-01

(Sections 4.a and 4.e).

.

- - , - - -