ML20133M531

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Dec 1996 for McGuire Nuclear Station
ML20133M531
Person / Time
Site: McGuire, Mcguire  
Issue date: 12/31/1996
From: Dimmery T
DUKE POWER CO.
To:
Shared Package
ML20133M496 List:
References
NUDOCS 9701220415
Download: ML20133M531 (10)


Text

_

0FERATIN3 DATA REPORT DOCKET N3 50-369 DATE January 15. 1997 DPERATING STATUS CDMPLETED BY R.A. Willians TELEPHONE 704-382-5346

1. U1it Nase: McGuire 1
2. Reporting Period: Decesber 1, 199 H ecesber 31,1996
3. Licensed Thersal Pcuer (MWt):

3411

4. Naseplate Rating (6ross 'tWe):

1305*

Notes *Naseplate Rating l

5. Design Electrical Rating (Net MWe):

1180 (Bross MWel calculated as

6. Maxinus Dependable Capacity (6ress MWe):

1171 1450.000 MVA x.90 power

7. Maxisus Dependable Capacity (Wet MWe):

1129 factor por Page lii,

8. If Changes Occur in Capacity Ratings (Itess Nusber 3 Thrcugh 7) Since Last NURES-0020.

Repert. Give Reasons:

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason for Restrictions, If any:

This Month Yr.-to-Date Cusulative

11. Heurs In Reporting Period 744.0 8784.0 132240.0
12. Nusber Of Hours Reactor Was Critical 744.0 7952.7 96392.0
13. Reactor Reserve Shutdown Hours

--0--

--0--

--0--

14. Hours Benerator On-Line 744.0 7859.9 95391.5
15. Unit Reserve Shutdoun hours

--0--

--0--

--0--

16. Gross Thermal Energy Senerated (MWH) 2369229 26065960 300820062
17. Gross Electrical Energy Ger.erated (MWH) 818850 8914839 103290119
18. Nat Electrical Energy Generated (MWH) 786873 8558285 98725856
19. Uait Service Factor 100.0 89.5 72.1
20. Unit Availability Factor 100.0 89.5 72.1
21. Unit Capacity Factor (Using MDC Net) 93.7 86.3 65.2
22. Unit Capacity Factor (Using DER Net) 89.6 82.6 63.3
23. Unit Forced Dutage Rate 0.0 3.8 12.9
24. Shutdown Scheduled Dyer Next 6.ionths (Type Date, and Duration of Each):

Refueling & Steam Generator Replacement - February 14, 1997 - 100 days

25. If Shut Denn At End Of REpcrt Period. Estisated Date cf Startup:
26. Units In Test Status (Frior to Cossercial Operation):

Ferecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY C01MERCIAL QPERATION 9701220415 970115 PDR ADOCK 05000369 R

PDR

OPERAi!NG EATA REPORT DOCKET N0 50-369 UNIT McGuire 1 DATE January 15. 1996 COMPLETED BY R.A. Williaes TELEPHONE 704-382-5346 MONTH December. 1996 D,fl AVERASE DAILY POWER LEVEL pf1 AVERASE DAILY POWER LEVEL (MWe-Net)

(MWe-Net)

I 190 17 1140 2

216 18 1161 3

454 19 1142 4

1130 20 1162 5

1138 21

!!42 6

1139 22 1143 7

1139 23 1143 2

1139 24 1144 9

!!39 25 1143 10 1138 26 1142 11

!!?9 27 1142 12 1139 23 1143 13

!!39 29

!!43 14

!!39 30

!!42 15 1139 31 1142 1

16

!!39 4

2 i

i UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-369 UNIT NAME -'le!Cyuust; 1 1

DATE v1/id/yI REPORT MONTH December 1996 COMPLETED BY x.

A.

williams i

TELEPHONE

(/us)-382-33so i

(1)

(2)

(3)

(4)

(5)

R MET-E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE l

O P

DURATION O

DOWN REPORT TEM COMPONENT ACTION TO i

DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 13-P 96 1 F

A

'SD VALVEX STEAM GENERATOR "D"

FEEDWATER CONTAINMENT ISOLATION VALVE LEAK 14-P 96 1 F

A SD VALVEX STEAM GENERATOR "D"

FEEDWATER i

CONTAINMENT ISOLATION VALVE REPAIR i

COMPLETE i

15-P 96 3 F

A HH VALVEX STEAM GENERATOR FEEDWATER CONTROL BYPASS VALVE i

A (1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions i

S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data 4

B-Maintenance or test 2-Manual Scram Ent y Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER (NUREG-0161))

D-Regulatory Restriction 4-Other (Explain)

File E-Operator Training & License Examination F-Administrative (5)Exhibit I - Same source (Explain) (Explain)

G-Operator Error H-Other 4

4 6

9 a

s

i a

j 4

i i,

j' DOCKET: 50-369 UNIT: McGuire I t

Date:

01/15/97 l

i i

4 7

i NARRATIVE

SUMMARY

l l

1 MONTH: December,1996 e

. McGuire Unit I began the month of December holding at approximately 22% full power until 12/01/% at 0820 when the unit began increasing power. The unit held at 28% power from 12/01/96 at 0925 to i

12/03/96 at 1134 to complete steam generator "D" feedwater containment isolation valve repair. Ths W 4

continued power escalation and held at 61% power from 1648 to 1835 due to steam generator feedwater control bypass valve failing to show full open. The unit returned to 100% full power on 12/04/% at 0305 l

and operated at or near 100% full power the remainder of the month.

l 4

i.

1 1

3 i

i i

4 1i Prepared by: R. A. Williams Telephone:(704)- 382-5346 I

i

l L

l l

MONTHLY REFUELING INFORMATION REOUEST l

1.

Facility name:

McGuire. Unit 1 2.

Scheduled next refueling shutdown: February 1997 3.

Scheduled restart following refueling: May 1997 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL 'NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or l

other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

l 7.

Number of Fuel assemblies (a) in the core: J93 l

(b) in the spent fuel pool: 223 8.

Present licensed fuel pool capacity: 1463 Size of requested or planned increase: ---

l 9.

Projected date oflast refueling which can be accommodated by present license capacity: March l

2006

  • f DUKE POWER COMPANY DATE: January 15.1997 l

Name of

Contact:

},. A. Williams Phone: (704)- 382-5346 i

l' l

I f

i

.. -...-~ -.. -..

-. - -. ~. -.. -.... - - _ _. - -

-... - _.. ~..

[

l DPERATING DATA REPORT R

DOCKET NO 50-370 r

DATE January 15. 1997 OPEFATING STATUS COMPLETED BY R.A. Williaes

-[

1. Unit Name: McGuire 2
2. F.eporting Peried: December 1, 1996-Decreber 31,1996
3. Licensed Thereal Power (MWt):

3411 l

4. Naseplate Rating (Gross Ne):

1305e Notes #Naseplate Rating

5. Design Electrical Rating (Net MWeb 1180 (Gross MWel calculated as l
6. Maxinus Dependable Capacity (Bress MWe):

1171 1450.000 MVA

.90 power

7. Marisue Dependable Capacity.(Net MWe):

!!29 factor per Page lii, l

E. If Changes Occur in capacity Ratings (! tees Nusber 3 Through 7) Since Last NURE6-0020.

Report. Give Reasons:

i l

9. Power Level To Which Restricted, if Any (Net MWe):
10. Reason For Restrictions, If any:

-This Month Yr.-to-Date Cueulative

11. Hours in Reperting Period 744.0 8784.0 112536.0
12. Nueber Of Hturs Reactor Was Critical 744.0 6586.9 88342.6
13. Reactor Re,erve Shutdown Hours

--0--

--0--

--0--

14. Hours Bene ator On-Line 744.0 6545.3 87276.0
15. Unit Reserve Shutdown Hours

--0--

--0--

--0--

16. Gross The' sal Energy Benerated (MWH) 2529393 21863261 287102910
17. Bross Electrical Energy Generated (MWH) 885703 7569759 100073035
18. Het Electrical Energy Senerated (MWH) 854241 7255888 95968245
19. Unit Service factor-100.0 74.5 77.6
20. Unit Availability Factor 100.0 74.5 77.6
21. Unit Capacity Factor (Using MDC Net) 101.7 73.2 74.8
22. Unit Capacity Factor (Using DER Net) 97.3 70.0 72.3
23. Unit forced Outage Rate 0.0 16.5 7.2
20. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each h None
23. If Shut Ioan At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Coseercial Operation):

Forecast Achieved INITIAL CRITICAL!TY I

thlTIAL ELECTRICITY l

COMMERCIAL CPERATION 4

4 i

f 1

i OPERATING DATA REPORT DOEKET NO 50-370 UNIT Mt6uire 2 DATE Januarv 15,1996 COMPLETED BY R.A. Willians TELEPHONE 704-382-5346 j

l 90 NTH Deceeber,1996 Q!Q AVERASE DAILY POWER LEVEL DE AVERABE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) i 1148 17 1148 2

1148 19 1148 3

!!40 19 1149 4

!!48 20 1149 5

!!46 21 1149 6

!!46 22 1149 7

1147 23 1149 8

!!47 24 1150 9

1147 25 1149 l

10

!!46 26

!!49 11

!!49 27

!!49 l

12 1150 28 1149 l

13

!!49 29

!!50 l

14 1147 30 1149 l

15 1147 31 1149 16 1145 4

)

l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-370 U N I T N A M E M w u i x t; z DATE ul/1d/v/

REPORT MONTH December 1996 COMPLETED BY x.

A.

williams TELEPHONE

( 104 ) - J ts z - d a e e (1)

(2)

(3)

(4)

(5)

R MET-E HOD T

A OF LICENSE N

Y S

SHUT

' EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT.

TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions S Scheduled A-Equihment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER

( M EG-0161))

D-Regulato n Restriction 4-Other (Explain)

File E-@erator Training & License Examination F-Administrative (5)

(Explain) (Explain)

Exhibit I - Same Source G-Operator Error H-Other e

9 e

e

-.a-

-.u -

___-.-..__-._-..---.-___--_-________,,,ws-.e,

,n

,.--.-_... -.,_ _._....-._.. -. ~....._...= _ _.

- - -. - - -..-... -.. -,,- ~...

i j.

DOCKET: 50-370 UNIT: McGuire 2 i

Date:

01/15/97 NARRATIVE

SUMMARY

I l

t MONTH: December,1996 l

McGuire Unit 2 began the month of December operating at 100% full power. The unit operated at or near 100% full power for the entire month.

I i

l l

r i

t i

)

I Prepared by: R. A. Williams Telephone: (704) 382 5346 i

I i

l 1

1

. _. -. =. - - -. - -.. ~..

r e

I MOtJTHLY REFUELING INFORMATION REOUEST 1.

Facility name:

McGuire. Unit 2 2.

Scheduled next refueling shutdown: Scotember 19'7 3.

Scheduled restart following refueling: January 1998 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF

(

ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or l

other license amendment?

i l

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

I j

7.

Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuelpool: 269 8.

Present licensed fuel pool capacity: 1463 Size of requested or planned increase: =

l 9.

Projected date oflast refueling which can be accommodated by present license capacity:

December 2003 l

DUKE POWER COMPANY DATE: January 15.1997 i

l l

Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 l

1 l

l

- -. -.