ML20133M401

From kanterella
Jump to navigation Jump to search
Forwards MORs for Dec 1996 for SONGS Units 2 & 3 and Revised MORs for Aug,Sept & Oct 1996
ML20133M401
Person / Time
Site: San Onofre  
Issue date: 01/15/1997
From: Gibson G
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20133M403 List:
References
NUDOCS 9701220376
Download: ML20133M401 (1)


Text

,

- mya so m -ao,o~.

Jis E E)lfs(Jir4 An flilSO% IVil RN41tC % Al. Cumguy January 15, 1997 l

U. S. Nuclear Regulatory Commission t

Attention: Document Control Desk Washington, D. C.

20555 Gentlemen:

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for December 1996 San Onofre Nuclear Generating Station, Units 2 and 3 Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires Edison to provide a Monthly Operating Report for each Unit, which includes operating statistics and shutdown experience, including documentation of all challenges to pressurizer safety valves.

This letter transmits the December 1996 Monthly Operating Reports for Units 2 and 3, in Enclosures 1 and 2, respectively.

There were no challenges to the pressurizer safety valves.

As a separate item, Enclosure 3 provides corrected pages for August, September and October, 1996.

Changes are noted by revision bars in the right margin.

If you have any questions, please contact Mr. C. E. Williams at (714)368-6707.

Sincerely, Gregor

. Gibson Manager, Compliance Enclosures cc:

L. J. Callan, Regional Administrator, NRC Region IV J.

E. Dyer, Director, Division of Reactor Projects, NRC Region IV I

K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV M.

B. Fields, NRC Project Manager, Units 2 and 3 J. A. Sloan, Senior NRC Resident Inspector, San Onofre Units

., [%

2& 3

/

ono-.

9701220376 970115 PDR ADOCK 050003611 R

P EWt _

j j

Sp

r. o. nox 128

)

San Clemente, CA 92e74-0128