Forwards Insp Rept 50-458/85-62 on 850816-0915 & Notice of Violation
ML20133L757
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/18/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
GULF STATES UTILITIES CO.
Shared Package
ML20133L760 List:
References
NUDOCS 8510240294
Download: ML20133L757 (2)


See also: IR 05000458/1985062

Text

1

.-

.

OCT 181985

In Reply Refer To:

Docket: 50-458/85-62

Gulf States Utilities

ATTN: William J. Cahill, Jr.

Senior Vice President

River Bend Nuclear Group

P. O. Box 2951

Beaumont, Texas

77704

Gentlemen:

This refers to the inspection conducted by Messrs. D. D. Chamberlain, C. C.

Harbuck, J. P. Jaudon, and W. M. McNeill of this office during the period

August 16.through September 15, 1985, of activities authorized by NRC Operating

License NPF-40.for River Bend Station, and to the discussion of our findings

with Mr. J. C. Deddens and other members of your staff at the conclusion of the

inspection.-

Areas examined during the inspection included site tours, initial fuel loading

witness, overall startup test program review, surveillance testing baseline

witness, operational safety verification and licensee quality concern program

review. Within these areas, the inspection consisted of selective examination

of procedures and representative records, interviews with personnel, and

observations by the inspectors. These findings are documented in the enclosed

report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required 'to respond to

-this violation, in writing, in accordance with the-provisions of Section 2.201

of the NRC's " Rules of' Practice," Part 2, Title 10, Code of Federal

Regulations.

Your response should be based on the specifics contained in the

Notice of Violation enclosed with this. letter.

.

T

esponse directed by this letter and the accompanying Notices are not

suusect to the clearance procedures of.the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

i.

'

,

i

)

&"

R

SJ

RPB

RPB/

.

'RSB/OS

RSB/0S

PB

Chamberlain /g%v//[/85

Harbuck

JPJ don

WMMcNeill

DMHunn cutt

HJ hnson

tv///85

'/

/d/ / /85

to/f/85

to/j/85-

g//4/85

8510240294 85101B

PDR

ADOCK 05000450

G

PDR

O

.

e

.

- - --

___

-

,

-

.

A

L ulf States Utilities

-2-

G

-Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Origins! Signed By

E. H. Johnen

E. H. Johnson, Chief

Reactor Projects Branch

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-458/85-62

cc w/ enclosures:

Gulf States Utilities

ATTN:

J. E. Booker, Manager-

Engineering, Nuclear

Fuels & Licensing

P. O. Box 2951

Beaumont, Texas

77704

Louisiana State University

Government Documents Department

Louisiana Radiation Control Program Director

bcc to DMB (IE01)

bec distrib. by RIV:

  • RPB

R. P. Denise, DRSP

  • Resident Inspector

R. D. Martin, RA

  • SectionChief(RPB/A)
  • 0. Weiss, LFMb (AR-2015)
  • MIS System
  • W. M. McNeill, RSB/OS
  • RSTS Operator
  • C. C. Harbuck, RPB/A
  • R&SPB
  • RSB
  • RIV File
  • w/766

.

m

. -

.

.

.

.

.

. .