ML20133J430
| ML20133J430 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 10/01/1985 |
| From: | Mangan C NIAGARA MOHAWK POWER CORP. |
| To: | Starostecki R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| (55(E)-85-26), (NMP2L-0501), (NMP2L-501), NUDOCS 8510180440 | |
| Download: ML20133J430 (2) | |
Text
h -
24
.se M Y NIAGARA RUMOHAWK NIAGARA MOHAWK POWER CORPORATION /300 ERIE BOULEVARD WEST. SYRACUSE N.Y.13202/ TELEPHONE (315) 474-1511 October 1,1985 (NMP2L 0501)
Mr. R. W. Starostecki, Director U.S. Nuclear Regulatory Comission Region I Division of Reactor Projects 631 Park Avenue King of Prussia, PA 19406 Re: Nine Mile Point - Unit 2 Docket No. 50-410
Dear Mr. Starostecki:
Enclosed is an interim report in accordance with 10CFR50.55(e) for the problem concerning electrical panelboards field versus saismic test mounting configuration.
This problem was reported via tel-con to J. Linville of your staff on August 30, 1985.
Very truly yours, C. V. Mangan Senior Vice President CV:UGG/cla (1235H) xc: Director of Inspection and Enforcement U.S. N iclear Regulatory Commission Washington, DC 20555 R. A. Gram, NRC Senior Resident Inspector ProjectFile(2) 0510180440 851001 4 7 PDR ADOCK 05000410 1
S PDR 1
\\
-.=
I i
NIAGARA M0 HAWK POWER CORPORATION I
NINE MILE POINT - UNIT 2 ~
DOCKET NO. 50-410 Interim Report for a Problem Concerning
[
Electrical Pane 1 boards Field Versus Seismic Test Mounting Configuration l
(55(e)-85-26)
Description of the Problem i
Quality Assurance Category I distribution panelboards, as identified in Nonconformance and Disposition Report No. 0032, were installed in a mounting 4
configuration which was not representative of the configuration used for seismic qualification by the Vendor.
This problem was identified during the j
seismic qualification walkdown of electrical distribution panelboard 4
EJS*PNL100A.
}
The matter is under investigation and a final report will be submitted by December 30, 1985.