Interim Deficiency Rept (55(e)-85-26) Re Electrical Panelboards Field Vs Seismic Test Mounting Configuration. Initially Reported on 850830.Final Rept Will Be Submitted by 851230
ML20133J430
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 10/01/1985
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
(55(E)-85-26), (NMP2L-0501), (NMP2L-501), NUDOCS 8510180440
Download: ML20133J430 (2)


Text

h -

24

.se M Y NIAGARA RUMOHAWK NIAGARA MOHAWK POWER CORPORATION /300 ERIE BOULEVARD WEST. SYRACUSE N.Y.13202/ TELEPHONE (315) 474-1511 October 1,1985 (NMP2L 0501)

Mr. R. W. Starostecki, Director U.S. Nuclear Regulatory Comission Region I Division of Reactor Projects 631 Park Avenue King of Prussia, PA 19406 Re: Nine Mile Point - Unit 2 Docket No. 50-410

Dear Mr. Starostecki:

Enclosed is an interim report in accordance with 10CFR50.55(e) for the problem concerning electrical panelboards field versus saismic test mounting configuration.

This problem was reported via tel-con to J. Linville of your staff on August 30, 1985.

Very truly yours, C. V. Mangan Senior Vice President CV:UGG/cla (1235H) xc: Director of Inspection and Enforcement U.S. N iclear Regulatory Commission Washington, DC 20555 R. A. Gram, NRC Senior Resident Inspector ProjectFile(2) 0510180440 851001 4 7 PDR ADOCK 05000410 1

S PDR 1

\\

-.=

I i

NIAGARA M0 HAWK POWER CORPORATION I

NINE MILE POINT - UNIT 2 ~

DOCKET NO. 50-410 Interim Report for a Problem Concerning

[

Electrical Pane 1 boards Field Versus Seismic Test Mounting Configuration l

(55(e)-85-26)

Description of the Problem i

Quality Assurance Category I distribution panelboards, as identified in Nonconformance and Disposition Report No. 0032, were installed in a mounting 4

configuration which was not representative of the configuration used for seismic qualification by the Vendor.

This problem was identified during the j

seismic qualification walkdown of electrical distribution panelboard 4

EJS*PNL100A.

}

The matter is under investigation and a final report will be submitted by December 30, 1985.