ML20133J007

From kanterella
Jump to navigation Jump to search
Recommends Approval of Application for U Recovery Process
ML20133J007
Person / Time
Site: 07000036
Issue date: 05/12/1960
From: Beck C
US ATOMIC ENERGY COMMISSION (AEC)
To: Johnson L
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20133G976 List: ... further results
References
FOIA-96-343 NUDOCS 9701170364
Download: ML20133J007 (1)


Text

Project 3-0 Lyall E. Johnson, Chief Docket 77-35 Licensing Br--ch Clifford K.

.k, Chief Hazards Evaluation Branch MALLINCKBOOT NUCLEAR C0tF.

We have reviewed the Mallisekrodt application 4ated April 14, 1960, requesting approval of a ursaium recovery process.

The recovery process involves dissolution, extraction, precipitation, and filtration. The applicant has based safety se the design of equipment of safe geometry. In addition, safe mass limits will also be imposed is some of the operations. Mallinckrodt has based the spacing of individent pieces of equipment on the appropriata solid angle calculations.

We rae-=d approval of the equipment and proceduras preposed by 1

i Mallinckrodt.

j i

)

1 i

i b

4 l

i

)

v D

HRR tnf An [

WRR3DL&R opygg y CKBeckh CD uk : p L4 i

sunname >

)

DATE >

vorm anc-atu ra..ua>

i.-.mi.

9701170364 970114 1

PDR FOIA FLOYD96-343 PDR 4

_