Rev 1 to Monthly Operating Rept for June 1985
ML20133H985
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 06/30/1985
From: Mike Williams
KANSAS GAS & ELECTRIC CO.
To:
Shared Package
ML20133H976 List:
References
NUDOCS 8510180217
Download: ML20133H985 (3)


Text

'

OPEPATING DATA REPOIC DOCKET NO.

STN 50-482 WLF CREEK GENEIMTING STATION KANSAS GAS AND ELECTRIC COMPANY DATE 7-01-85 COMPLETED BY M. Williams TELEPHONE 316-364-8831 i

OPERATING STATUS 1.

Reporting Period: June, 19_85 Gross Hours in Reporting Period:

437.0 2.

Currently Authorized Power Ievel(MNt): 3411 Max. Depeni. Capacity (MNo-Net) : 1117 Design Electrical Rating (Tide-Net):

1170

_ Expected)

(

3.

Ibwer Level to Which Restricted (If Any) (Mwe-Net) :

N/A 4.

Reasons for restriction (If Any):

Tnts Month Yr to Date CtInulative 5.

Number of Hours Reactor was Critical 349.1 665.8 665.8 6.

Ibactor Reserve Shutdown Hours 0.0 0.0 0.0 7.

Hours Generator on Line 318.8 318.8 318.8 8.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 9.

Gross Thermal Energy Generated (MEI) 356,676 356,676 356,676

10. Gross Electrical Energy Generated (MWH) 79,608 79,608 79,608
11. Net Electrical Energy Generated (MWH) 65,344 65,344 65,344 12.

Reactor Service Factor N/A a

l

13. Reactor Availability Factor N/A
14. Unit Service Factor N/A l
15. Unit Availability Factor N/A l

l

16. Unit Capacity Factor (Using MDC)

N/A

17. Unit Capacity Factor (Using Design MNe)

N/A

18. Unit Forced Outage Rate N/A 4
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each): None i

20.

If Stut Down at End of Report Period, Estimated Date of Startup:

7-2-85 l

21. Units in test Status (Prior to Connercial Operation): Forecast Achieved Initial Criticality 5-22-85 5-22-85 Initial Electricity 6-13-85 6-12-85 Caninercial Operation 9-09-85 l

page 7 of 11 8510180217 850930 Revision 1 PDR ADOCK 05000482 R

PDR t

AVERAGE DMLY UNIT IOiER LEVEL DOCKET NO.

STN 50-432 WOLF CREEK GENElWilNG STATION FANSAS GAS AND ELECTRIC COMPANY DATE 7-01-85 O>1PIETED BY M. Williams TELEPIONE 316-364-8831 MONIH. Tune, 1985 DAY AVERN3E IAILY TGiER LEVEL dew AVERAGE DAILY RMER IEVEL (K.Ve-Net)

(M.ie-Net).

1 0

17 172 2

0 18 173 3

0 19 191 4

0 20 201 5

0 21 227 6

0 22 252 7

0 23 151 8

0 24 0

9 0

25 208 10 0

26 274 11 0

27 256 12 0

28 276 13 7

29 112 14 81 30 0

15 212 31 N/A 16 172 INSTRLCPIONS:

On this form, list the average daily unit power level in MWe-Net for each day in the reportiry month. Canpute to the nearest whole megawatt.

'Ihese figures will be used to plot a graph for each reparting nunth. Note that when maximum dependable capacity is used for the not electrical ratirg of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnotes to explain the apparent anonaly.

Page 8 of 11 Revision 1

UNIT S!!I111XM1 NID POWER REDUCTIO'IS DOCKFiff0.

STN 50-482.

WOLF CREEK GENEfMTING STATION KANSAS GAS AND ELECTRIC 00l4PANY DATE 7-01-85 COMPLIffED BY M. Willia:ns l

REPORf f40NI'I June, 1985 TELEPHONE 316-364-8831 TYPE METDIODS SilUPfIfG F: FORCED DURATION REASON DOWN Tile RFACTOR CORREOPIVE ACfl0NS/CObr4ENTS NC DATE S: SCIIEDlJLED (IIOURS)

(1)

OR REIUCING IOc7ER(2) 850602 F

19.0 B

1 lbf Control Probl6ns investigated.

850602 P

55.5 B

1 Further investigation of Ibd Control problens.

850606 F

26.8 II 3

Poaer Ascension Testirx3 (Licence Event Report 85-039-00).,

1 850612 F

6.5 A

3 Problems with Turbine En41 Limiting Circuitry.

2 850613 F

0.6 A

3 Further problem with Turbine Inal Limitiry3 Circuitry.

3 850613 F

26.7 A

2 Unit taken off-line dua to turbine vibration.

Reactor trip due to Main Peelwater Pung trip occurrel during this shutdown (Licensee Event Repart 85-011-00).

4 850614 F

7.0 G

3 Turbf le trip due to insufficient reactor power to support turbine loarlin] (Licensee F#ent Report 85-044-00).

5 850617 S

1.7 B

1 Manual turbine trip per Power Ascensioa Testing.

6 850623 F

39.0 G

3 Reactor tripped when Reactor trip breakers were inadvertently opanel (Licensee Event Report 85-045-00).

Secory3 Reactor trip occurred during this shutilown due to leakage through feedwater check valves (Licensea Event Report 85-046-00).

7 850629 S

36.8 B

4 Manually trippel reactor froa Auxiliary Shutdoan Panel to denonstrate its operability.

Str.?RY:

Initial entry into flo3e 1 (Pocr O!nre. ion) occurrel on June 6,1985, anl the unit was initially synchronized to the grid on June 12,1935, at 1900 hour0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br /> *:. Testin:3 at the twenty arr3 thirty percent p)aer plateaua has been conpleted.

(1)

REASON: A:

EQUIPMENP FAILURE (EXPIAIN)

E: OPEPATOR TR\\INING M19 LICENSE EXAt4INATION (2)

MErnlOD:

1.

MANUAL B: f4AINTENANCE OR TEST F: AD11NISCRATIVE 2.

MANUAL SCRA:4 C: RFFIELING G: OPERNPIONAL ERROR (EXPIAIN) 3.

AUIOf4ATIC SCRW D: REGULA'IORY RESCRICTION II: ODIER (EXPLAIN) 4.

OnlER (EXPLAIN)

Page 9 of 11 Revision 1

. -