Text
,-
OPERATI;M DATA REFORP DOCK!?P NO.
STN 50-482 WOLF CREEK GENERATING STATION KANSAS GAS NID ELECTRIC COMPA*4Y DTTE 8-01-85 COMPIRTED BY M. Williams TELEPflONE316-364-8831 OPERATING STATUS 1.
Reportiry Perio3: July, 1985 Gross flours in Reparting perio3:
744 2.
Currently Authorized rower Level (MNt): 3411 Ma<. Dtoeni. Capacity (MWe-Net) : 1117 Design Electrical Ratin3 (tide-Net) :
1170 3.
Power tevel to Which Restricted (If Any) (Mwe-Net) :
N/A 4.
Reasons for restriction (If Any):
N/A This Monta Yr to Date Ctraulative 5.
Number of flours Reactor was Critical 545.0 1210.8 1210.8 6.
Reactor Reserve Shutdown flours 0.0 0.0 0.0 7.
11ours Generator on Line 503.5 822.3 822.3 8.
Unit Reserve Shutdown 11ours 0.0 0.0 0.0 i
9.
Gross Thermal Energy Generated (MWI) 1,025,780 1,382,456 1,382,456
- 10. Gross Electrical EnettJy Generated (!MI) 333,719 413,327 413,327
- 11. Net Electrical Energy Generated (Mai) 310,547 375,891 375,891
- 12. Reactor Service Factor N/A
- 13. Reactor Availability Factor N/A
- 14. Unit Service Factor N/A
- 15. Unit Availability Factor N/A
- 16. Unit Capacity Factor (Using MDC)
N/A
- 17. Unit Capacity Factor (Usirs Dasign MWe)
N/A
- 18. Unit Forced Outage Rate N/A
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each) : None 20.
If Shut Down at End of Report Period, Estimated Date of Startup:
8-01-85
- 21. Units in test Status (Prior to Cdunercial Operation): Forecast Achieved Initial Criticality 5-22-85 5-22-85 Initial Electricity 6-13-85 6-_12-85 Ccmnercial Operation 9-09-35 Page 6 of 11 8510180222 850930 R9Vi3iO3 1 PDR ADOCK 05000482 R
AVERAGE IRILY UNIT POWER IEVEL DOChTP No. STN 50-482 WOLP CREEK GENERWING STATION KANSAS GAS AND ELFfrRIC COMPMN IMTE 8-01_-85 LDiPIEPED 13Y M. Wil1ians TELEPfl0NE316-364-8831 M W at July, 1985 IMY AVERAGE IMILY POSER LEVEL DAY AVFMGS IMIIN KMER IEVEL
(%ie-Net)
(Kie-Net) 1 0
17 474 2
0 18 502__
3 0
19 584 4
0 20 715 5
181 21
_ 758 6
423 22 808 7
474 23 324 8
487 24 603 9
229 25 800 10 0
26 727 11 0
27 808 12 0
28 801 13 268 29 817 14 427 30 850 15 446 31 114 16 173 l
INSTRUCTIONS:
On this form, list the average daily unit power level in Nie-Net for each day in the i
reporting month. Ccunpute to the nearest whole megawatt.
l These figures will be used to plot a graph for each reporting month. Note that when maximun dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should tn footnoted to explain the apparent ananaly.
Page 7 of 11 Revision 1 l
UNIT SilUPDOWri ND IVMER REDUCTIONS DOCKiff FO.
SIN 50-482 WOLF CPEEK GENERATING SfN#lM '
KANSAS GAS MJD ELECTRIC COP 4PANY DATE 8-01-85 l
COMPIRfED BY M. Williame REFORP MOVal July, 1985 TELEP!KXIE 316-364-8_831 TYPE MLTIOrX3 SIIUPflNG F: FORCED DURATION REASON DOWri Tf!E REACIUR CORRECTIVE ACTIONS /COPPIEMPS No Date S: SCHEDULED (HOURS)
(1)
OR _REIUCI!K3 PMER(2) 7 850629 S
107.3 B
4 Manual Trip per Startup Test ProJram fron Auxiliary Shut-down Panel to denonstrate its operability.
8 850709 F
90.9 A
3 Trip due to feedwater control problen dariry Startup Test Progratn transient testing. A test recorder inJuced a false control signal (Licensee Event Report 85-049-01). Two subsequent reactor trips occurred durinj this shutdown (Licensee Event Reports 85-0 42-00 arrl 85-050-00).
9 850715 S
11.3 8
3 neactor trip to test negative rate trip circuit.ry and analyze plant perfoonance per Power Ascension Testin3 10 850723 F
10.8 A
3 Trip due to instranent power supply failure resulting in loss of control power to a feelpump.
(Licensee Event Retort 85-054-00) 11 850728 S
0 B
4 Large Inarl Rrrinction Test per Power Ascension Testin3 12 850731 F
20.2 A
3 Trip due to failure of a power range Nuclear Instrumentation channel while a secool channel was urtler test.
(Licensee Event Report 85-058)
S'RiARY: Durin3 the moth of July, Povr Ascension Testing was conpletel at the fifty arrl seventy-five parcent p>wer plateaus. ' thin testing inclirlal a large lovl reloction test an1 inactor trip tests. Several trips occurre1 due to feelwater
- p;te ri relatel problens.
(1)
T W W 1: A: EQUIRicir FAIUJRE (EXPIAIN)
E: OPERAIUl TRAININI NID LICENSE EXA>1IN4 TION (2) METf]D:
1.
MNUAL 0: tMIIII' ERIN!CE Od TEST P: ADMIrlISTR\\TIVE 2.
MANUAL SCRAM C: REFUELUK3 G: OPERATIONAL ZRlYJR (EXPLAIN) 3.
NJIORTIC SCIW1 0:
REGiJIA'IDW RESPRICPION II: OmER (EXPIAIN) 4.
OTHER (EXPLAIN)
Page 8 of 11 Revision 1
-