GOVERNMENT ACCOUNTABILITY PROJECT 1555 Connecticut Avenue, N.W., Suite 202 Washington, D.C. 20036 (202)232-8550 Freedom of Information Act Request i
I March 6, 1985 udM UE NU" ts Director ACT REQUESI Office of Administration U.S. Nuclear Regulatory Commission f'OIA-85-lSY Washington, D.C.
20555 To Whom It May Concern:
k O
Pursuant to the Freedom of Information Act (FOIA), 5 U.S.C.
Section 552, the Government Accountability Project (GAP) requests copies of any and all agency records and information, including but not limited to notes, letters, memoranda, drafts, minutes, d'
-ies, logs, calendars, tapes, transcripts, summaries, inter-5 ce wrts, procedures, instructions, engineering analyses, dx y files, graphs, charts, maps, photographs, agreements, m
'handa Atten notes, studies, data sheets, notebook s, books, tele-phone messages, computations, voice recordings, computer run-offs, any other data compilations, interim and/or final reports, status reports, and any and all other records relevant to and/or generated in connection with all information, provided in any i
form, to the Department of Energy Nuclear Power Task Force about i
Comanche Peak.
This request includes all agency records as defined in 10 C.F.R.
Section 9.3a(b) and the NRC Manual, Appendix 0211, Parts 1.A.2 and A.3 (approved October 8, 1980) whether they currently exist in the NRC official, " working", investigative or other files, or at any other location, including private residences.
If any records as defined in 10 C.F.R.
Section 9.3a(b) and the NRC Manual, supra, and covered by this request have been des-troyed and/or removed after this request, please provide all j
surrounding records, including but not limited to a list of all records which have been or are destroyed and/or removed, a des-
[
cription of the action (s) taken relevant to, generated in connec-
[
tion with, and/or issued in order to implement the action (s).
U o
GAP requests that fees be waived, because " finding the inforne-i tion can be considered as primarily benefitting the general L
public," 5 U.S.C. 552(A)(4)(A).
GAP is a non profit, nonpartisan public interest organization concerned with honest and open f
government.
Through public outreach, the Project promotes whis-j tieblowers as agents of government accountability.
Through its j
Citizens Clinic, GAP offers assistance to local public interest U
and citizens groups seeking to ensure the health and safety of their communities.
The Citizens Clinic is currently assisting M
\\[ T h 4 V (,
8508090576 850306 PDR FOIA GARDE 85-154 PDR l
7 c
- s a
Freedom of Information Request March 6, 1985 Page Two i
several citizens groups, local governments and intervenors in the i
mid-Michigan area concerning the construction of the Midland 4
plant.
We are requesting the above information as part of an ongoing monitoring project on the adequacy of the NRC's efforts to protect public safety and health at nuclear power plants.
For any documents or portions that you deny due to a specific FOIA exemption, please provide an index itemizing and describing the documants or portions of documents withheld.
The index should provide a detailed justification of your grounds for claiming each exemption, explaining why each exemption is relevant to the document or portion of the document withheld.
This index is required under Vaughn v. Rosen (I), 484 F.2d 820 (D.C. Cir. 1973), cert. denied, 415 U.S. 977 (1974).
We look forward to your response to this request within ten days.
()
~
b(
c
) Y v'l v/%-[./\\
'j l-Billie Pirner Garde Citizens Clinic Director 2
e 1
i f
I