' Mailing Address Alab,ama Power Company 600 North 18th Street Post Off.ce Box 2641
'8;rmingham. A!abama 35291 Teleprone 205 783-6090 R. P. Mcdonald L
Senior Vice Pres acnt Flentndge Bwiding f\\l[]f)[}[))[] f0WC[
October 14, 1985 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Comission Washington, D. C.
20555 Attention: Mr. S. A. Yarga Joseph M. Farley Nuclear Plant - Units 1 and 2 Licensing Items Requiring NRC Approval in 1985/86 Gentlemen:
Attached for your information is a proposed schedule for the completion of 1985/86 licensing items.
This attachment is tabulated chronologically by Alabama Power Company's requested NRC approval date.
If you have any questions, please advise.
Yours very trul Q lY
,?
~
(
(",
'J
\\
R. P. Mc onald RPM /CJS:bdh-017 Attachment cc: Mr. L. B. Long Dr. J. N. Grace Mr. E. A. Reeves.
Mr. W. H. Bradford 00
$ i
?
8510180134 851014 DR ADOCK 05000348 PDR
ATTACHENT PAGE 1 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE _
DATE(S)
DATE DATE REMARKS 1.
ISI Code Relief 10-14-85 12-31-85 Critical Request for 10 Outage Item, Year Reactor FNP-1 Vessel Examination, FNP-1 and 2 2.
Administrative 9-19-85 3-07-86 Change for offsite and onsite Organizational Changes, FNP-1 and 2 (T.S.
Figures 6.2-1 and 6.2-2) 3.
Revised Heatup 10-31-85 05-16-86 Critical and Cooldown (FNP-1)
(FNP-1)
Outage Item, Curves Based on FNP-1 and 2 Regulatory 09-30-85 03-14-86 Guide 1.99, (FNP-2)
(FNP-2)
Rev. 2 FNP-1 and 2 4.
Correct Note 12-01-85 06-06-86 for Rx Trip Signal on Turbine Trip for Plant Start-up, FNP-1 and 2(T.S.
Table 4.3-1, Item 17.B) 5.
Remove Rod Bow 11-27-85 06-06-86 Penalty, FNP-1 and 2 (T.S.
3.2.3 and Bases, Delete Figure 3.2.3) l
ATTACHENT PAGE 2 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE i
REMARKS 6.
Clarification 11-27-85 06-06-86 of Dose Equivalent I-131 (DEI)
Dsfinition, FNP-1 and 2 (T.S. 1.9) 7.
Administrative 12-06-85 06-13-86 Change to Fire Protection and Miscellaneous Other Tech.
Specs., FNP-1 and 2 (T.S.
Table 3.3-12) 8.
Snubber Visual 01-15-86 07-18-86 Inspection Period Adjustment Criteria Change, FNP-1 and 2 (T.S.
3/4.7.9) 9.
Increase RWST 01-31-86 08-01-86 Boron Concentration, FNP-1 and 2 (T.S. 3.5.5, 3.5.1)
- 10. Reactor Coolant 02-07-86 08-27-86 Dump Operability Change for Mode 3, FNP-1 and 2 (T.S. 3/4.
4.1.2)
- 11. Extend 03-07-86 09-05-86 Operating l
License Expiration Date, FNP-1 and 2 (License) c
ATTACHENT PAGE 3 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SU8MITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE i
REMARKS 12.
Small Diesel 03-14-86 09-19-86 G:nerators Testing, FNP-1 and 2 (T.S.
3/4.8.1)
- 13. Technical 04-01-86 10-10-86 Specification Optimization Program, FNP-1 and 2 (T.S.
3/4.3)
- 14. Change to 04-04-86 10-10-86 Clarify Method of QPTR and AFD Channel Calibrations, FNP-1 and 2 (T.S. 4.2.1.2, 4.2.4.2, Table 4.3-1)
- 15. Steam Generator 05-01-86 11-03-86 Plugging Limits, FNP-1 and 2 (T.S.
Figure 2.1-1 and Section 3.2.2)
- 16. Daletion of 05-30-86 12-05-86 Appendix B of License, FNP-1 and 2 (E.P.P.)
- 17. Change AFD 08-01-86 02-05-87 Target Band FNP-1 and 2 (T.S. 3.2.1 and 4.2.1.4)
- 18. Deletion of 09-05-86 03-12-87 Na0H Tank, FNP-1 and 2 (T.S. 3/4.6.2.2 and Bases) l CJS:ddb:D17 I