ML20133G645

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs,Clarifying Surveillance Requirement for Containment Ventilation Isolation Sys.Certificate of Svc Encl
ML20133G645
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 10/11/1985
From:
PORTLAND GENERAL ELECTRIC CO.
To:
Shared Package
ML20133G622 List:
References
NUDOCS 8510160064
Download: ML20133G645 (2)


Text

<> LCA 131 i Attachment 1 Page 1 of 1 REFUELING OPERATIONS CONTAINMENT VENTILATION ISOLATION SYSTEM LIMITING CONDITION FOR OPERATION 3.9.9 The Containment Ventilation Isolation System shall be OPERABLE.

APPLICABILITY: MODE 6 ACTION:

With the Containment Ventilation Isolation System inoperable, close each of the penetrations providing direct access from the Containment atmosphere to the outside atmosphere. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.9.9 The Containment Ventilation Isolation System shall be demonstrated OPERABLE within 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> prior to the start of and at least once per 7 days during CORE ALTERATIONS by verifying that Containment Ventilation isolation occurs on manual initiation and on a high radiation signal from each of the applicable Containment process radiation monitoring instrumentation channels specified in Table 3.3-13.

~

8510160064 851011 PDR ADOCK 05000344 P PDR TROJAN-UNIT 1 3/4 9-9

[

L UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

PORTLAND GENERAL ELECTRIC COMPANY, ) Docket 50-344 THE CITY OF EUGENE, OREGON, AND ) Operating License NPF-1 PACIFIC POWER & LIGHT COMPANY )

)

(TROJAN NUCLEAR PLANT) )

CERTIFICATE OF SERVICE I hereby certify that copies of License Change Application 131 to the Operating License for Trojan Nuclear Plant, dated October 11, 1985, have been served on the following by hand delivery or by deposit in the United States mail, first class, this lith day of October 1985:

Mr. Lynn Frank, Director State of Oregon Department of Energy Labor & Industries Blds, Rm 102 Salem OR 97310 Mr. Robert L. King Chairman of County Commissioners Columbia County Courthouse St. Helens OR 97051 I

/. .  ;,z VM G. A. Zimmerman, Manager Nuclear Regulation Branch Nuclear Safety & Regulation Subscribed and sworn to before me this lith day of October 1985.

212di-Notary Public of Oregffn My Commission Expires: tw[ N /k7 '

0

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -