ML20133G390
| ML20133G390 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 01/14/1997 |
| From: | Rainsberry J SOUTHERN CALIFORNIA EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20133G394 | List: |
| References | |
| NUDOCS 9701160027 | |
| Download: ML20133G390 (1) | |
Text
,
h 50U1111RN CALiIORNl A e
EDISON An il)IM)V /\\TLR\\ 4710NAl. G.mpan)
January 14, 1997 U. S. Nuclear Regulatory Commission l
Attention: Document Control Desk j
Washington, D. C.
20555 Gentlemen:
Subject:
Docket Nos. 50-361 and 50-362 Seismic Hazard for the Individual Plant Examination of External Events (IPEEE)
San Onofre Nuclear Generating Station Units 2 and 3
Reference:
December 15, 1995 letter from Walter C. Marsh (Edison) to Document Control Desk (NRC),
Subject:
Response to Generic Letter 88-20, Supplement 4, Individual Plant Examination of External Events (IPEEE)
In response to a request from Mr. Mel B. Fields, the NRC Project Manager for San Onofre Units 2 and 3, by this letter Southern California Edison is providing the " Seismic Hazard at San Onofre Nuclear Generating Station," Final Report, Risk Engineering Inc., dated August 25, 1995 (copy enclosed).
This report was referenced in the San Onofre Units 2 and 3 Individual Plant i
Examination of External Events which was submitted to the NRC by the above reference.
If you have any questions or would like additional information, please let me know.
I i
Sincerely, ff0 9701160027 970114 l
PDR ADOCK 05000361 P
. L. Rainsberry l
Manager, Plant Licensing l
Enclosure cc:
L. J. Callan, Regional Administrator, NRC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3 H. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 P. O. Ikn IN San Clemc T4 92674-0128 wma.
m
-