ML20133G390

From kanterella
Jump to navigation Jump to search
Forwards Final Rept, Seismic Hazard at SONGS, in Response to Request from Mb Fields
ML20133G390
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 01/14/1997
From: Rainsberry J
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20133G394 List:
References
NUDOCS 9701160027
Download: ML20133G390 (1)


Text

,

h 50U1111RN CALiIORNl A e

EDISON An il)IM)V /\\TLR\\ 4710NAl. G.mpan)

January 14, 1997 U. S. Nuclear Regulatory Commission l

Attention: Document Control Desk j

Washington, D. C.

20555 Gentlemen:

Subject:

Docket Nos. 50-361 and 50-362 Seismic Hazard for the Individual Plant Examination of External Events (IPEEE)

San Onofre Nuclear Generating Station Units 2 and 3

Reference:

December 15, 1995 letter from Walter C. Marsh (Edison) to Document Control Desk (NRC),

Subject:

Response to Generic Letter 88-20, Supplement 4, Individual Plant Examination of External Events (IPEEE)

In response to a request from Mr. Mel B. Fields, the NRC Project Manager for San Onofre Units 2 and 3, by this letter Southern California Edison is providing the " Seismic Hazard at San Onofre Nuclear Generating Station," Final Report, Risk Engineering Inc., dated August 25, 1995 (copy enclosed).

This report was referenced in the San Onofre Units 2 and 3 Individual Plant i

Examination of External Events which was submitted to the NRC by the above reference.

If you have any questions or would like additional information, please let me know.

I i

Sincerely, ff0 9701160027 970114 l

PDR ADOCK 05000361 P

PDR

. L. Rainsberry l

Manager, Plant Licensing l

Enclosure cc:

L. J. Callan, Regional Administrator, NRC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3 H. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 P. O. Ikn IN San Clemc T4 92674-0128 wma.

m

-