Amend 83 to License DPR-72,changing Tech Specs to Delete Surveillance Requirement 4.8.1.1.1.a.2 Re Verification of Sump Pump Operability in Tunnel Containing Dc Control Supply to 230 Kv Switchgear
ML20133G280
Person / Time
Site: Crystal River 
Issue date: 09/30/1985
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Florida Power Corp, City of Alachua, FL, City of Bushnell, FL, City of Gainesville, FL, City of Kissimmee, FL, City of Leesburg, FL, City of New Smyrna Beach, FL, Utilities Commission, City of New Smyrna Beach, FL, City of Ocala, FL, City of Orlando, FL, Orlando Utilities Commission, Sebring Utilities Commission, Seminole Electric Cooperative, City of Tallahassee, FL
Shared Package
ML20133G282 List:
References
DPR-72-A-083 NUDOCS 8510150317
Download: ML20133G280 (5)


Text

.

pancy

'((Sg,(/-p jo UNITED STATES 4

[g NUCLEAR REGULATORY COMMISSION g

N,

WASHING TON, D. C,20555 l

FLORIDA POWER CORPORATION i

CITY OF ALACHUA CITY OF BUSHNELL CITY OF GAINESVILLE CITY OF KISSIMMEE CITY OF LEESB'JRG CITY OF NEW SitYRNA BEACH AND UTILITIES COMMISSION, CITY OF NEW SMYRNA BEACH i

CITY OF OCALA ORLANDO UTILITIES COMMISSION AND CITY OF ORLANDO l

SEBRING UTILITIES COMMISSION SEMINOLE ELECTRIC COOPERATIVE, INC.

CITY OF TALLAHASSEE DOCKET NO. 50-302 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT AMENDMENT TO FAC.;ITY OPERATING LICENSE Amendment No. 83 License No. DPR-72 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Florida Power Corporation, et al.

(the licensees) dated July 25, 1984, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act).

and the Comission's rules and regulations set forth in 10 CFR Chapter I; 8.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

pp 9aa M u" P

s i

i,

3 l

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, i

j and paragraph 2.C.(2) of Facility Operating License No. OPR-72 is hereby j

amended to read as follows:

Technical Specifications i

The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 83, are hereby incorporated in the license. Florida Power Corporation shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance, i

FOR THE NUCLEAR REGULATORY COMMISSION a

~

$E l

< John F. Stolz, Chief -

Operating Peactors Branch #4 Division of Licensing 4

i

Attachment:

1 Changes to the Technical Specifications i

Date of Issuance: September 30, 1985 i

a i

i i

ATTACHMENT TO LICENSE AMENDMENT NO. 83 FACILITY OPERATING-LICENSE NO. DPR-72 DOCKET NO. 50-302 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by Amendment number and contains a vertical line indicating the area of change. The corresponding overleaf page is also provided to maintain document completeness.

Page 3/4 8-2

.o 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION s

3.8.1.1 As a minimum, the following A.C. electrical power sources shall t

be OPERABLE:

a.

Two physically independent circuits between the offsite trans-mission network and the onsite Class lE distribution system, and b.

Two separate and independent diesel generators each with:

1.

A separate day fuel tank containing a minimum volume of 400 gallons of fuel, 2.

A separate fuel storage system containing a minimum volume of 20,300 gallons of fuel, and 3.

A separate fuel transfer pump.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

a.

With either an offsite circuit o'r diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirements 4.8.1.1.1.a and 4.8.1.1.2.a.4 within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least two offsite circuits and two diesel' generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least'HDT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the folloving 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

y l

b.

With one offsite circuit and one diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirements 4.8.1.1.1.s and 4.S.I.l.2.a.4 within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least one of the inoperable sources to OPERABLE statur,within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT STANDBY within.the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30, hours. Restore at least two offsite circuits and two'dieselagenerators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the time of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and'in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

CRYSTAL RIVER - UNIT 3 3/4 8-1

ELECTRICAL POWER SYSTEMS i

l ACTION (Continued) c.

With two of the above required off-site A.C. circuits inoperable, demonstrate the ' OPERABILITY of two diesel generators by performing Surveillance Requirement 4.8.1.1.2.a.4 within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, unless the diesel generators are already operating; restore at least one of the inoperable off-site sources to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. With only one off-site source restored, restore at least two off-site circuits to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

d.

With two of the above required diesel generators inoperable, demonstrate the OPERABILITY ' of two off-site A.C. circuits by. performing Surveillance Requirement 4.3.1.1.1.a within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereaf ter; restore at least one of the inoperable diesel generators to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore at least two diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time 1

of initialloss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.3.1.1.1 Each independent circuit between the off-site transmission network and the on-site Class IE distribution system shall be:

i a.

Determined OPERABLE at least once per 7 days by verifying correct breaker alignments and indicated power availability.

i o.

Demonstrated OPERABLE at least once per 18 months during shutdown by transferrring unit power supply from the normal circuit to the alternate circuit.

i n

i CRYSTAL RIVER - UNIT 3 3/43-2 Amendment No. 83 l