:on 841125,gas Grab Sample Not Obtained While Vent Stack Monitor 1RE-PR028 Inoperable,Per Tech Spec Action Statement.Caused by Personnel Error.Control Room Personnel Counseled on Proper Action Statement Requirements
ML20133F648
Person / Time
Site: Byron Constellation icon.png
Issue date: 07/31/1985
From: Scott A
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20133F558 List:
References
LER-84-015, LER-84-15, NUDOCS 8508080370
Download: ML20133F648 (2)


LER-1984-015, on 841125,gas Grab Sample Not Obtained While Vent Stack Monitor 1RE-PR028 Inoperable,Per Tech Spec Action Statement.Caused by Personnel Error.Control Room Personnel Counseled on Proper Action Statement Requirements
Event date:
Report date:
4541984015R00 - NRC Website

text

P

~

tes para as Seal us seuCLE An assuLAtomy Commsessos.

AP'mowtD onse eso 3tto.eios LICENSEE EVENT REPORT (LER)

*"'88'"

  1. AciLffy NANs 111 DMEtt Isumn (31 FAGEda -

BYRON. UNIT 1 TITLs les 0 l5 l 0 l0 l0 l4 l 5l 4 1lOFl0p FAILURE TO TAKE SAMPLE REQUIRED BY TECHNICAL SPECIFICATIONS evowf e4To m Lea enmesen sei nosomT e4Te sti ofusa e Acetmas novoLvso mi M iM 94v VGAA YtA"

"'s.

'b n

esoNTm oav YtAR

'9C' L87 ' mansas ooCatT seousemise oisi0icici i i lil 2a5 84 8s 4 Oil 15 On 1 07 3 il 85 1

I I

I I I I

I I

I o isto 1 0 tog i j Tus aeronT e TTeo runeue=7 To Two neouineue=Ts or is Can t rcw w e, sw -

8"** #'

3

.: nii maareni se semi esrse.nsn tanme peguen NAmenn1He massenti es.7stensnes Ts.f t tel nos 01010 semesa.inHei es.se4.im se rmnani.es of gyg, i!?pib, $is 8'*" H"'

.x,L, utshnano ursonan.enAs assAs

, ':,,. ;, n

'x v W::::

Mmf1H.I m780sninal 30.7stantna LICEIGEE CONTACT Fon TMit Len pri TELEPo*oNE NupetR Alan B. Scott, Health Physicist, Ext. 282

'"C***

8l1 g5 2pil1 4

5 4 g4 gl i

oOes'LeTE o8st Llose Pom BACH :: hier? FAILURE ossCRletD IN TMie RSPoAT (tal

CAuse

SysTOM CoespoMENT

  • O

"((N' CAust system CowPoNENT

"'%,"4

"(

^$8 N) g y9 A

N g

g g g l l g q.c l

I I l I l l I

I I l l l l euseteuserTA6 menoaf eme CTeo nei uo=Tu cav vgan

~] ves tre, a amCreo scesission oA ras

% no svowessiom

. ACTruwe...se

.,A.

g g

g

~.

,no The Byron Unit-1 Auxiliary Building Vent Stack Monitor (lRE-PR028) was declared inoperable at 1200 on 11/24/84. A gas grab sample required by the Tech Spec Action Statement was missed at 1500 on 11/25/84 due to personnel error. Both Control Room personnel and Rad-Chem Foremen have been instructed to verify that the action statement has been exited prior to terminating the sampling requirements.

This revised'LER is submitted to designate the cause code assigned this event.

8508080370 850731 PDR ADOCK 05000454 S

PDR

0

)

deaC Pw = Ss4A U S IsuCatan at0ULATOaY Cosensiesiose UCENSEE EVENT REPORT (LER) TEXT CONTINUATION Amovfo o se no 3 iso-oio.

tuhats s'314S P AcattYv esaast gis 00 Calf musseta 121 gen segnasta ige pact (31

" U E ="

E*sU BYRON, UNIT 1 0 l5 l0 l0 l0 l4 l5 l4 8l 4 0l1 0l2 OF 0 l2 Ol1l5 terra eem

.asen,nacs assewsin A gas grab sample required by Tech Spec 3.3.3.10 action statement was not taken as required. The action statement was entered at 1200 on 11/24/84 and a sample

~

was nissed at 1500 on 11/25/84 for 1RE-PR028 ( Auxiliary Building Vent Stack Monitor). The plant was in operating mode 5.

When the action statement was entered, sampling was initiated by the Rad-Chem Department as required by Technical Specifications.

Due to a cognitive error a required sample was not taken at 1500 on 11/25/84.

The monitor was declared operable and the action statement was exited at 0856 on 11/26/84.

Because Byron Station had not yet reached initial criticality, no radioactive releases could have occurred during the period.

In addition, no high radiation alarms were received on process radiation monitors upstream of the vent stack monitor. Therefore, plant and public safety were not affected.

Both Control Room personnel and Rad-Chem Foremen have been instructed to verify that the action statement has been exited prior to terminating the sampling requirements.

Previous Similar Events

LER 84-14-00 e