ML20133E449
| ML20133E449 | |
| Person / Time | |
|---|---|
| Site: | 07001113 |
| Issue date: | 06/26/1985 |
| From: | Barr K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Lees E GENERAL ELECTRIC CO. |
| Shared Package | |
| ML20133E453 | List: |
| References | |
| NUDOCS 8508070706 | |
| Download: ML20133E449 (1) | |
Text
'
Dh JUN 2 61985 General Electric Company ATTN:
Mr. Eugene A. Lees, General Manager Nuclear Fuel Manufacturing Department P. 0. Box 780 Wilmington, NC 28402 Gentlemen:
SUBJECT:
REPORT NO. 70-1113/85-09 On June 11 - 14, 1985, NRC inspected activities authorized by Special Nuclear Material License No. SNM-1097 for your Wilmington facility.
At the conclusion of-the inspection, the findings were discussed with those members of your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely, s/ E.NM&
Kenneth P. Barr, Chief Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards
Enclosure:
Inspection Report No. 70-1113/85-09 cc w/ encl:
C. M. Vaughan, Manager Regulatory Compliance bcc w/o enc 1:
License Fee Management Branch bec w/ enc 1:
Document Control Desk State of North Carolina RII RII GTr a
EM e
0 /p 8 06/26/85 8508070706 850626 ZEoo 8/l PDR ADOCK 07001113 C
/