Forwards Insp Rept 50-271/85-26 on 850903-06.No Violation Noted.Corrective Actions Stated in 850425,0531 & 0820 Ltrs Examined.Reexam of Completed Actions Will Be Conducted During Future Insp
ML20133D167
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 10/01/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20133D171 List:
References
NUDOCS 8510080223
Download: ML20133D167 (2)


See also: IR 05000271/1985026

Text

-

.

._

.

. , -

-

- - -

.

,

-

.

1

OCT 011985

Docket No. 50-271

,

Vermont Yankee Nuclear Power Corporation

ATTN:

Mr. Warren P. Murphy

~

Vice President and Manager

of Operations

RD 5, Box 169

Ferry Road

Brattleboro, Vermont 05301

Gentlemen:

Subject:

Inspection Report No. 50-271/85-26

,

This refers to the special team. inspection conducted by Dr. P. K. Eapen and

'

others of this office on September 3-6, 1985, at your office, the Vermont

Yankee Nuclear Power Station, Vernon,, Vermont and Yankee Atomic Electric

Company offices, Framingham, Massachusetts, of activities authorized by NRC

4

License No. DPR-28 and to the discussions of our findings held by Dr. Eapen

'

- with you and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspec-

tion Report which is enclosed with this letter. Within these areas, the inspec-

tion consisted of selective examinations of procedures and representative re-

cords, interviews with personnel, and observations by the inspector.

s

Our inspectors also reviewed the status of the steps you' nave taken to correct

+

the violations brought to your attention in the enclosure to our letter dated

.

April 25, 1985. We have no further questions regarding your actions up to this

>

time as detailed in the inspection report and will examine further actions

i

during a future inspection of your licensed facility.

In addition our inspectors examined the status of those activities covered in

your letters to us dated May 31, 1985 and August 20, 1985. We have no further

questions regarding this matter and will re-examine your completed actions

during a future inspection.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required.

Your cooperation with us in this matter

is appreciated.

,

Sincerely,

Origi:n1 Sig=ed Byg

Storart D. muster

05100802M f

271

PDR

ADOCK

PDR

Q

Stewart D. Ebneter, Director

Division of Reactor Safety

Enclosure: NRC Region I Inspection Report No. 50-271/85-26

0FFICIAL RECORD COPY

IR VERMONT YANKEE 85-26 - 0001.0.0

'

09/18/85

.

I

.

- s

Vermont Yankee

2

cc w/ encl:

Mr. R.~ W. Capstick, Licensing Engineer

Mr. W. F. Conway, President and Chief Executive Officer

Mr. J. P. Pelletier, Plant Manager

Mr. Donald Hunter, Vice President

Mr. Cort Richardson, Vermont Public

Interest Research Group, Inc.

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Hampshire

State of Vermont

bcc w/ encl:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o encls)

L. Tripp, Chief, Section #3A, DRP

M. McBride, SRI, Pilgrim

H. Eichenholz, SRI, Yankee

V. Rooney, LPM, NRR

efd

r

RI:

N'S

I:DRS

'RI:DRS

Eap n/sif

Bettenhausen

Ebneter

9/d/85

9/2W85

/@/[/85

.

OFFICIAL RECORD COPY

IR VERMONT YANKEE 85-26 - 0002.0.0

09/18/85