Ack Receipt of Denying That Violation Noted in Insp Rept 50-302/85-05 Occurred.Violation Occurred as Stated.Written Statement Describing Steps Taken to Correct Procedures Re whole-body Counting Sys Requested
ML20133D017
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/07/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Wilgus W
FLORIDA POWER CORP.
References
NUDOCS 8507220071
Download: ML20133D017 (2)


See also: IR 05000302/1985005

Text

. - . - - .. .- ._.. - .- .. -- - . - . . .- - -. -

[ffCSLl

,

,

MAY 071985

, Florida lower Corporation

<

ATTN: Mr. W. S. Wilgus

Vice President Nuclear Operations

-

P. O. Box 14042, M.A.C. H-2

,

St. Petersburg, FL 33733

$ Gentlemen: [

1 . i

SUBJECT
REPORT NO. 50-302/85-05

i

Thank you for your response of April 4,1985, to our Notice of Violation issued

j on March 5, 1985, concerning activities conducted at your Crystal River facility.

The above Notice of Violation cited your failure to have approved written radia-

j tion protection procedures for the calibration of the whole-body counting system

! presently in use. Your response stated that the bioassay program is not included

i in Appendix A of Regulatory Guide 1.33, November 1972 and therefore Florida Power

i Corporation was not in violation of Technical Specification procedural

j requirements.

j

i  ;

We disagree with your interpretation of Regulatory Guide 1.33, Appendix A issued  !
November 1972. Section G.5.c of the referenced guide states that the control of  !

j radioactivity in regard to personnel exposure which includes surveys and

! mcnitoring should be covered with written procedures. We believe that your

j whole-body counter was included in your personnel monitoring program, and as ,

j such, calibrations must be conducted in accordance with approved procedures. F

i After careful consideration of your denial of the noted Violation, we have ,

I concluded, for the reasons presented in this letter, that the violation occurred

j as stated in the Notice of Violation. Therefore, in accordance with

10 CFR 2.201(a), please submit to this office within 30 days of the date of this

~

j

j letter a written statement describing corrective steps which will be taken to

j avoid similar violations and the date when full compliance will be achieved.

l The response directed by this letter is not subject to the clearance procedures i

) of the Office of Management and Budget issued under the Paperwork Reduction Act I

j of 1980, PL-511.  :

i

We appreciate your cooperation in this matter. '

, Sincerely,

I

l

!

! Roger D. Walker, Chief

01 vision of Reactor Projects

]

j cc: (See page 2)

!

8.

M A I W aoa '" '

l ceol h

__ _ _ _ _ _ - - _ _ _

_ _ _ _ - _ _ - _ _ _ - _ _ -

- .

Florida Power Corporation 2

cc: E. M. Howard, Director

Site Nuclear Operations

P. F. McKee, Nuclear Plant Manager

G. R. Westafer, Manager

Nuclear Operations Licensing

and Fuel Management

bec: NRC Resident Inspector

1 Document Control Desk

State of Florida

II

G8Kuzo:cdg

Qh5 (/

ontgomery

hff(-

Collins ACarroll

I

,-

V nciera

ff

O Md d

04/p/85 04QLf85 f*V85 2)85

04/)(85 ,f f3-

R

gges*@-